Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Mar 24, 2017 08:05:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Mar 24, 2017 08:05:42 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    268468 Blog Entries  next>>
Departure: Yesterday @ 17:05
12427/Rewa - Anand Vihar SF Express (PT)
Trip# 105708    Traveller: Chaturvedi rf~    Linked PNR Entry# 2206890
Class: Sleeper - SL
From: STA/Satna Junction
To: ANVT/Anand Vihar Terminal
4 wishes
HJ HJ शुभ यात्रा भाई HJ
TRIP HAS ENDED.
Blog  Time-Table

  
16 views
Today (07:56)
Chaturvedi rf~   302 blog posts   57 correct pred (59% accurate)
Re# 2206890-2            Tags   Past Edits
TRIP HAS ENDED.
  
General Travel
0 Followers
90 views
Today (07:02)   12319/Kolkata - Agra Cantt SF Weekly Express

wwwpramit895~   14 blog posts
Entry# 2208610            Tags   Past Edits
Newly LHBfied + Offlink + throttle track sound
1st run of 12319/20 Kolkata-Agra Cantt Weekly Super Fast Express with Brand new LHB coaches hauled by Offlink 22341 ERODE (ED) WAP 4 throttling through Masagram (MSAE) @ flat 110 kmph
Watch it
Hope you will enjoy it
If
...
more...
you like it then Please Subscribe my channel for more
  
General Travel
0 Followers
269 views
Yesterday (23:14)  

Anshul Pandey~   387 blog posts
Entry# 2208511            Tags   Past Edits
There it is..LuCKNOW NR outer at its very best..Over 1 hour has gone..N these trains are still at Alamnagar..😐

3 posts - Yesterday

15 posts - Today

  
152 views
Today (00:39)
AkashNER~   466 blog posts   68 correct pred (65% accurate)
Re# 2208511-19            Tags   Past Edits
Sir, Lucknow mw projects itne pending pade hain ki agar wo ho jaye to LJN/LKO ki ladayi suljhane ki koi zarurat hi nahi padegi.

  
146 views
Today (00:43)
AkashNER~   466 blog posts   68 correct pred (65% accurate)
Re# 2208511-20            Tags   Past Edits
Entry Exit lines from either sides of LKO
Platform Upgradation (Increase in number and lengths of existing)
Good Yard relocation to either Alamnagar or Amausi
Satellite station AlamNagar(for BE/MB traffic) ,Byepass Station-Transport Nagar (BSB Traffic)

  
142 views
Today (00:47)
DhnEcr~   4882 blog posts
Re# 2208511-21            Tags   Past Edits
LKO being capital city plus NR division and still projects are not moving at desired pace. Hope with Center and State finally belonging to same Govt situation improves.

  
127 views
Today (01:00)
AkashNER~   466 blog posts   68 correct pred (65% accurate)
Re# 2208511-22            Tags   Past Edits
जी अब उत्तरप्रदेश वासियों को रेलवे तो छोड़िए, हर चीज़ में यही उम्मीद है कि केंद्र और प्रदेश में बीजेपी है तो अब रुके काम पूरे होंगे और जो आगे प्रस्ताव आएंगे वो जल्द से जल्द पारित होंगे और धरातल पर दिखेंगे ! हम लोग लखनऊ रेलप्रेमी भी इसी उम्मीद में हैं और आशा कर रहे हैं कि जल्द ही कुछ दिखेगा होता हुआ !

  
23 views
Today (07:52)
यूपी की जीत से कुछ लोग सदमे में*^~   6086 blog posts   121173 correct pred (90% accurate)
Re# 2208511-23            Tags   Past Edits
Bhai ye roj ka hey
  
General Travel
0 Followers
2964 views
Mar 05 2017 (11:51)  

New train should be sanctioned for Gangavati~   55 blog posts   2 correct pred (60% accurate)
Entry# 2186718            Tags   Past Edits
Can anyone please tell the progress of ongoing projects in South India (SWR,SCR,KR and SR)

18 posts - Sun Mar 05, 2017

2 posts - Mon Mar 06, 2017

1 posts - Tue Mar 07, 2017

1 posts - Tue Mar 14, 2017

6 posts - Sat Mar 18, 2017

3 posts - Sun Mar 19, 2017

1 posts - Tue Mar 21, 2017

  
304 views
Mar 22 2017 (08:50)
New train should be sanctioned for Gangavati~   55 blog posts   2 correct pred (60% accurate)
Re# 2186718-33            Tags   Past Edits
And what about guntakal - Yelahanka electrification sir?

  
Mar 22 2017 (09:05)
Rockstar Hubbali Janshatabdi~   1918 blog posts   700 correct pred (71% accurate)
Re# 2186718-34            Tags   Past Edits
GTL-GY-DMM-YNK is electrified but GTL-Kalluru (bypassing GY) is not electrified.

  
278 views
Mar 22 2017 (09:10)
Rockstar Hubbali Janshatabdi~   1918 blog posts   700 correct pred (71% accurate)
Re# 2186718-35            Tags   Past Edits
Also Hubbali bypass double line from Amargol to Hebsur is being done by RVNL connecting Gadag-UBL line with UBL-DWR line.

  
114 views
Yesterday (20:24)
New train should be sanctioned for Gangavati~   55 blog posts   2 correct pred (60% accurate)
Re# 2186718-36            Tags   Past Edits
What about ginigera-Raichur BG line?

  
32 views
Today (07:45)
Rockstar Hubbali Janshatabdi~   1918 blog posts   700 correct pred (71% accurate)
Re# 2186718-37            Tags   Past Edits
Check this, posted by Raghu sir: /blog/post/2205560
  
Rail Fanning
0 Followers
37 views
Today (07:40)   08189/Tatanagar - Visakhapatnam Special Fare Special | TATA/Tatanagar Junction (5 PFs) | BNDM/WDS-6/36206

Spotting TATA Antyodya~   361 blog posts
Entry# 2208626            Tags   Past Edits
BNDM red shunter , shunts 08189 towards the washing lines at TATANAGAR .
  
General Travel
0 Followers
129 views
Today (05:48)   CHTS/Cochin Depot (2 PFs)

thejusjj   13 blog posts
Entry# 2208594            Tags   Past Edits
When a train came calling at Cochin Harbour Terminus[CHTS]. The tracks came to CHTS. Snaps by Rtv @Robinjourno
Departure: Yesterday @ 21:55
15043/Lucknow Jn. - Kathgodam Express
Trip# 105601    Traveller: Proud CMSian~    Linked PNR Entry# 2204200
Class: AC 3-tier - 3A
From: LJN/Lucknow Junction NER
To: KGM/Kathgodam
6 wishes
HJ HJ HJ HJ HJ HJ
Train Status: on time
Last Update: at HDW/Haldwani @ Today (07:22)
Arrived at Trip Destination

Blog  Time-Table

1 posts - Wed Mar 22, 2017 - are hidden. Click to open.

9 posts - Yesterday - are hidden. Click to open.

2 posts - Today - are hidden. Click to open.

  
183 views
Today (04:40)
Proud CMSian~   293 blog posts   554 correct pred (79% accurate)
Re# 2204200-13            Tags   Past Edits
at BE/Bareilly Junction
Kumbha express arrived on pf 1

  
179 views
Today (04:46)
Proud CMSian~   293 blog posts   554 correct pred (79% accurate)
Re# 2204200-14            Tags   Past Edits
at BC/Bareilly City
departed

  
124 views
Today (06:17)
Proud CMSian~   293 blog posts   554 correct pred (79% accurate)
Re# 2204200-15            Tags   Past Edits
at PBW/Pantnagar
Arrived pantnagar

  
96 views
Today (06:47)
Proud CMSian~   293 blog posts   554 correct pred (79% accurate)
Re# 2204200-16            Tags   Past Edits
at LKU/Lal Kuan Junction
Arrived lalkuan century paper mill is clearly visible from lku station

  
67 views
Today (07:22)
Proud CMSian~   293 blog posts   554 correct pred (79% accurate)
Re# 2204200-17            Tags   Past Edits
at HDW/Haldwani
Arrived haldwani
  
Info Update
0 Followers
93 views
Today (06:59)   31873/Sealdah-Lalgola EMU Passenger | REJ/Rejinagar (2 PFs)

4πu¶am*^~   5713 blog posts   42282 correct pred (87% accurate)
Entry# 2208609            Tags   Past Edits
Traffic block on UP & DN Line between Rejinagar & Beldanga stations.
  
Info Update
0 Followers
96 views
Today (06:50)   SDAH/Sealdah (20 PFs)

4πu¶am*^~   5713 blog posts   42282 correct pred (87% accurate)
Entry# 2208603            Tags   Past Edits
Revised Parking Charges from 01.04.2017
  
Info Update
0 Followers
101 views
Today (06:55)   12327/Upasana Express | LBA/Lambhua (1 PFs)

4πu¶am*^~   5713 blog posts   42282 correct pred (87% accurate)
Entry# 2208606            Tags   Past Edits
Cancellation of trains for NI Work.
Page#    268468 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Apr 3
Trains with ARP 15 Dep on: Sat Apr 8
Trains with ARP 30 Dep on: Sun Apr 23
Trains with ARP 120 Dep on: Sat Jul 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site