Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Feb 24, 2017 10:09:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Feb 24, 2017 10:09:12 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    270631 Blog Entries  next>>
  
Rail News
0 Followers
744 views
IR Affairs
Feb 22 2017 (09:52)   Work to introduce semi-high speed trains on two routes to begin soon

©The Dark Lord™~   29 news posts
Entry# 2173925   News Entry# 294511         Tags   Past Edits
Indian Railways will soon start sub-projects aimed at introducing semi-high speed trains on the Delhi-Howrah and Delhi-Mumbai routes, a senior ministry official said on Tuesday. “The two sub-projects under ‘Mission Raftaar’ are expected to be completed in three years with a total outlay of Rs 18,163 crore,” the official said. After the upgrade, trains on the routes will run at a speed of 160 km per hour.
The ‘Mission Raftaar’ project of the Indian Railways envisages to raise the average speed of both passenger and freight trains. The mission is being spearheaded by a cross disciplinary mobility directorate in the Railway Board. The official, who spoke on the condition of anonymity, said a Detailed Project Report of the routes is being prepared.
...
more...

..
The Delhi-Howrah section will be upgraded at a cost of Rs 6,974 crore, and the Delhi-Mumbai section at an estimated Rs 11,189 crore. The official said the work involved replacing locomotives-hauled trains with Main line Electric Multiple Units and Diesel Electric Multiple Units trains.

6 posts - Wed Feb 22, 2017

3 posts - Yesterday

  
285 views
Yesterday (17:27)
Surat Mumbai Tejas Soon*^~   30390 blog posts   67737 correct pred (81% accurate)
Re# 2173925-10            Tags   Past Edits
Dahod ratlam section 100-110 hai 130 nahi

  
248 views
Yesterday (17:43)
©The Dark Lord™~   4957 blog posts
Re# 2173925-11            Tags   Past Edits
I don't have that much specific knowledge regarding this route so I just said what I have read in the RDSO report, if that's wrong then all OK. MPS of section was never an issue, I was just asking that why the cost of upgrading tracks varies that much between NDLS-HWH & NDLS-BCT routes.

  
233 views
Yesterday (17:52)
So Paddy Got Up~   2722 blog posts   1236 correct pred (71% accurate)
Re# 2173925-12            Tags   Past Edits
mountainous terrain. on flat plains it wouldn't cost much to upgrade, but here you have to literally move mountains to achieve 130 Kmph. for many trunk routes in India, the section passing through MP is the bottleneck, courtesy the plentiful mountains in that state. also, even on those tracks where 130 exists, banking is an issue. tighter curve can be done with more banking of line, but that causes discomfort to passengers. no banking leas to very high radius of curvature, so somewhere a compromise will be needed. long story short, the route out of mumbai is going to be a nightmare to upgrade to 160. you need to eliminate LC's, eliminate many banked sections of the track (there are bucket loads of them), literally move mountains in RTM-GDA stretch and upgarde the OHE to tolerate 160 Kmph (the reason for which talgo trials were done by WDP 4)

  
190 views
Yesterday (18:32)
a~   168 blog posts
Re# 2173925-13            Tags   Past Edits
There are curves on the mountainous terrain causing speed restriction.

  
1 views
Today (10:08)
a~   168 blog posts
Re# 2173925-14            Tags   Past Edits
There are curves on the mountainous terrain causing speed restriction.
  
★  General Travel
0 Followers
56 views
Today (09:45)   MFP/Muzaffarpur Junction (6 PFs)

Indian Railways the life line of our Nation~   11357 blog posts   136 correct pred (83% accurate)
Entry# 2176490            Tags   Past Edits
1 compliments
Well Done
And here is My Brand New IRI T-Shrit.
A big thanks to Moderator Sir who give me this awesome Tshirt.I got this Tshirt on 20 December2016.In less than 1year I became FM of IRI,completed 10K blogs and finally gets this Tshirt😎.Probably the first member of my area to get this tshirt.Now i am the proud owner of this.
Pic1 MFP Logo Pic2 Tshrit Pic4&5 IRI logo pasted on my Laptop.
Note-All
...
more...
pics posted from the permission of Moderator Sir.

3 posts - Today

  
35 views
Today (09:54)
Indian Railways the life line of our Nation~   11357 blog posts   136 correct pred (83% accurate)
Re# 2176490-5            Tags   Past Edits
Anyone

  
22 views
Today (10:00)
tejas soon on tracks   57 blog posts
Re# 2176490-6            Tags   Past Edits
Congrats

  
21 views
Today (10:02)
debarathi mandal   4249 blog posts   9725 correct pred (87% accurate)
Re# 2176490-7            Tags   Past Edits
Don't post this in open forum

  
12 views
Today (10:05)
1255712558 iso king   32 blog posts
Re# 2176490-8            Tags   Past Edits
cngrts yr

  
5 views
Today (10:07)
Rahul Kumar   2025 blog posts   1846 correct pred (78% accurate)
Re# 2176490-9            Tags   Past Edits
Congrats Yaar!
Mujhe bhi 1 year complete karne se pehle mil gaya
  
Rail Fanning
0 Followers
83 views
Today (09:19)   SEE/Sonpur Junction (4 PFs)

Bhavesh~   2949 blog posts   3810 correct pred (84% accurate)
Entry# 2176461            Tags   Past Edits
Just spotted the rake of NFR prince Dibrugarh Shatabdi at Sonpur.All coaches are NF marked even the EOG's also.Hope somebody from Barauni,Katihar or Njp side will spot it.Orange coloured alco (shed not seen)leading.

  
12 views
Today (10:05)
Rahul Kumar   2025 blog posts   1846 correct pred (78% accurate)
Re# 2176461-2            Tags   Past Edits
Pic liye ho ?

  
12 views
Today (10:06)
Bhavesh~   2949 blog posts   3810 correct pred (84% accurate)
Re# 2176461-3            Tags   Past Edits
Nahi bhai jab tak mobile nikalta train nikal chuki thi achi khasi speed me thi...approx 70-80.
  
General Travel
0 Followers
11 views
Today (10:06)  

shashikanthb   26 blog posts   4 correct pred (80% accurate)
Entry# 2176502            Tags   Past Edits
Recently I read the news about safety tests being conducted on the new Bangalore-Mangalore route till the 10th of Feb.
Haven't heard any news of the results since then.
Does any one have any updates on this and when can we expect passenger trains to run on this route.
Departure: Yesterday @ 13:56
12557/Sapt Kranti SF Express (PT)
Trip# 104176    Traveller: 1255712558 iso king    Linked PNR Entry# 2174131
Class: AC 2-tier - 2A
From: BMKI/Bapudham Motihari
To: ANVT/Anand Vihar Terminal
5 wishes
HJ HJ शुभ यात्रा HJ HJ bro
Train Status: 5h 42m late
Last Update: DLP/Dalpatpur 5 km<-->1 km KGFE/Kathghar East @ Today (10:06)
Next Station: KGFE/Kathghar East
Next Halt: MB/Moradabad Junction


Blog  Time-Table

1 posts - Wed Feb 22, 2017 - are hidden. Click to open.

33 posts - Yesterday - are hidden. Click to open.

6 posts - Today - are hidden. Click to open.

  
100 views
Today (09:10)
©®™१२४३९ राँची राजधानी एक्सप्रेस १२४४० ™®©^~   2085 blog posts   19513 correct pred (75% accurate)
Re# 2174131-41            Tags   Past Edits
kahan late ho gye ho ?

  
84 views
Today (09:19)
1255712558 iso king   32 blog posts
Re# 2174131-42            Tags   Past Edits
lko outer pe fir uske bad nr ka trolling same ncr ald dvsn jaisa ab fir se idhar udhar halt le rahi hai mb aa raha ab

  
82 views
Today (09:20)
1255712558 iso king   32 blog posts
Re# 2174131-43            Tags   Past Edits
mast ja rahi thi bro but ye kambhkat nr ne bahut troll kiya dil bhar kar troll kiya ise

  
66 views
Today (09:26)
1255712558 iso king   32 blog posts
Re# 2174131-44            Tags   Past Edits
at MB/Moradabad Junction
arvd finally

  
9 views
Today (10:06)
1255712558 iso king   32 blog posts
Re# 2174131-45            Tags   Past Edits
DLP/Dalpatpur 5 km<-->1 km KGFE/Kathghar East: 5h 38m late
on mps
  
General Travel
0 Followers
96 views
Today (09:12)   51451/Pune - Baramati Passenger (UnReserved) | PUNE/Pune Junction (6 PFs) | GTL/WDM-3A/13466

Anurag WAPAHOLIC~   6206 blog posts   843 correct pred (67% accurate)
Entry# 2176451            Tags   Past Edits
GTL WDM3A pulls out of Pune with Pune - Daund - Baramati Shuttle

  
38 views
Today (09:52)
dnyaneshwar   58 blog posts
Re# 2176451-1            Tags   Past Edits
when WCAM3/ e-loco pulls out of Pune - Daund pass trains ?

  
10 views
Today (10:06)
Anurag WAPAHOLIC~   6206 blog posts   843 correct pred (67% accurate)
Re# 2176451-2            Tags   Past Edits
No idea brother... Still under cards only..
  
General Travel
0 Followers
284 views
Yesterday (21:19)   DBRG/Dibrugarh (4 PFs)

Dibrugarh Shatabdi to Be Inaugrated soon~   4231 blog posts   1610 correct pred (73% accurate)
Entry# 2175984            Tags   Past Edits
Here Come NFR Prince aka DBRG Shatabdi
With 2k16 Made Shatabdi Livery Coaches
Source: Abhinav Phangcho ( Permission Taken)

5 posts - Yesterday

  
170 views
Yesterday (22:39)
Indian Railways the life line of our Nation~   11357 blog posts   136 correct pred (83% accurate)
Re# 2175984-6            Tags   Past Edits
Vo kahenge,Sppaming

  
170 views
Yesterday (22:42)
Dibrugarh Shatabdi to Be Inaugrated soon~   4231 blog posts   1610 correct pred (73% accurate)
Re# 2175984-7            Tags   Past Edits
Bhai ab Information hi de Raha Hu koi Bakwaas nahi kar Raha Hu

  
165 views
Yesterday (22:44)
Indian Railways the life line of our Nation~   11357 blog posts   136 correct pred (83% accurate)
Re# 2175984-8            Tags   Past Edits
Ok,calm down

  
119 views
Today (08:49)
Dibrugarh Shatabdi to Be Inaugrated soon~   4231 blog posts   1610 correct pred (73% accurate)
Re# 2175984-9            Tags   Past Edits
Which one u think is Suitable ?
------------------------------
12085 GHY DBRG Shatabdi
12086 DBRG GHY Shatabdi
------------------------------
12087
...
more...
GHY DBRG Shatabdi
12088 DBRG GHY Shatabdi
------------------------------
12089 GHY DBRG Shatabdi
12090 DBRG GHY Shatabdi
------------------------------
12091GHY DBRG Shatabdi
12092 DBRG GHY Shatabdi
------------------------------
12093 GHY DBRG Shatabdi
12094 DBRG GHY Shatabdi
------------------------------
12095 GHY DBRG Shatabdi
12096 DBRG GHY Shatabdi
------------------------------
12097 GHY DBRG Shatabdi
12098 DBRG GHY Shatabdi
------------------------------
12233 GHY DBRG Shatabdi
12234 DBRG GHY Shatabdi
------------------------------
12255 GHY DBRG Shatabdi
12256 DBRG GHY Shatabdi
------------------------------
12271GHY DBRG Shatabdi
12272 DBRG GHY Shatabdi
------------------------------
12287 GHY DBRG Shatabdi
12288 DBRG GHY Shatabdi
--------------------------------
Select your Choice of Numbers

  
80 views
Today (09:09)
Prancing Deer   270 blog posts   21 correct pred (62% accurate)
Re# 2175984-10            Tags   Past Edits
122XX are for durontos..( I know HWH Puri shatabdi and CBE MAS Shatabdi are 122xx numbered coz they are converted from duronto to Shatabdi) 120XX will be suitable
  
Rail News
0 Followers
80 views
New Facilities/TechnologySWR/South Western  -  
Today (08:04)   Bengaluru-Hassan broad gauge line may open next month

rdb*^   126032 news posts
Entry# 2176314   News Entry# 294636         Tags   Past Edits
MYSURU: After nearly 21 years, the Bengaluru-Hassan broad gauge line may be operational from mid-March 2017. The project for the 172-km stretch between Bengaluru and Hassan was sanctioned in 1996 when HD Deve Gowda was the Prime Minister.
In 1996, the project cost was Rs 295 crore but now due to delay for various reasons, including land allotment and sanction of money, it costs Rs 1,289.92 crore. Once operational, the travel distance from Bengaluru to Hassan will be reduced by 50km via Arsikere and about 87km via Mysuru. The distance between Bengaluru and Hassan is 259km via Mysuru and 213km via Arsikere.
The
...
more...
new line will connect Bengaluru (starting point Chikkabanavar) with Hassan via Nelamangala, Kunigal, Yediyur and Shravanabelagola. The track is almost parallel to National Highway 48 (Bengaluru and Mangaluru). The Hassan-Shravanabelagola line, a 44km stretch, was opened in 2006, but the project didn't proceed until 2010 due to shortage of funds and land. The project gained momentum in 2010 when the state government agreed to bear half the project cost and by then, railways had spent Rs 335 crore.It will also reduce the travel time between Bengaluru and Mangaluru. The 368-km route from Bengaluru will be 10.5 hour till Mangaluru and will help the existing route via Mysuru and Hassan which takes nearly 12 hours and Arsikere and Hassan take 11.15hours. The new line will also help devotees going to Shravanabelagola.
It was a long-pending demand of the Jain community.
The Commissioner for Railway Safety (CRS) conducted statutory inspection of the section from Nelamangala to Shravanabelagola. The section from Bengaluru and Nelamangala on one end and Hassan and Shravanabelagola on the other has already been commissioned for passenger traffic. The stretch from Nelamangala to Shravanabelagola will be operational after CRS authorization.
Sanjiv Agarwal, divisional railway manager, Bengaluru Division, South Western Railway, said, "For most projects, funding and land are the two bottlenecks. There was no proper assured funding for this project and there were some land issues which were later resolved. Now, we're awaiting authorization from the Commissioner of Railway Safety. We require more staff, at least 100 to start with."

  
172 views
Today (08:04)
rdb*^   30561 blog posts   359684 correct pred (79% accurate)
Re# 2176314-1            Tags   Past Edits
after 21 years,,great!

  
24 views
Today (10:01)
irifan2015   459 blog posts
Re# 2176314-2            Tags   Past Edits
Atleast now, SWR should nullify HMRDC agreement. Else whole investment in this line will be waste. Make Hassan a hub for intra state connectivity. Hope we get MAQ-SBC, MAQ-MAS, MAQ-TPTY, MAQ-PDY & MAQ-SA via new line. Apart from this, we expect some trains terminating at SBC/YPR to go upto Hassan (KCVL-SBC,EKM-SBC, MAS-SBC ICE, etc)
  
★★★  Rail Fanning
0 Followers
442 views
Yesterday (21:15)   22630/Tirunelveli - Mumbai Dadar Express (via Konkan) | ROHA/Roha (3 PFs) | UBL/WDG-4/12078

ALLP RailFan~   908 blog posts
Entry# 2175982            Tags   Past Edits
Super Offlink Hubballi WDG 4 12078 Waiting For Starters with 22630 Tirunelveli- Dadar Superfast Express at ROHA

  
301 views
Yesterday (23:54)
rooky1979   35 blog posts
Re# 2175982-1            Tags   Past Edits
Seems the train does have a crew change at Roha Station.

  
272 views
Today (00:04)
So Paddy Got Up~   2722 blog posts   1236 correct pred (71% accurate)
Re# 2175982-2            Tags   Past Edits
Many of the newer trains introduced on KR have crew change at roha.
  
General Travel
0 Followers
51 views
Today (09:38)   16106/Tiruchendur - Chennai Egmore (Chendur) Express | MLMR/Melmaruvathur (4 PFs)

Ulunderpet Tirupati Passenger   13 blog posts   12 correct pred (96% accurate)
Entry# 2176482            Tags   Past Edits
depratus at 16106 tiruchendur-chennai egmore express .. melmaruvathur of #sb please updated ...
Page#    270631 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 6
Trains with ARP 15 Dep on: Sat Mar 11
Trains with ARP 30 Dep on: Sun Mar 26
Trains with ARP 120 Dep on: Sat Jun 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Yesterday (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site