Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jun 26, 2017 18:05:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jun 26, 2017 18:05:51 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    297364 Blog Entries  next>>
  
★★  Pic Upload
0 Followers
843 views
Jun 22 2017 (17:37)   22627/Tiruchirappalli - Tirunelveli SF InterCity Express

TN Mainline should be electrified till tpj   368 blog posts   29 correct pred (69% accurate)
Entry# 2329344            Tags   Past Edits
Tpj-ten ice at trichy station on pf5

9 posts - Thu Jun 22, 2017

10 posts - Fri Jun 23, 2017

  
353 views
Jun 23 2017 (12:49)
Science is better than Engineering and Technology*^~   14084 blog posts   2 correct pred (100% accurate)
Re# 2329344-20            Tags   Past Edits
once KIK PEM opens means VLNK MS ICE nu through pannalam. once KKDI TVR line opens we can think of some day trains for TVR..

  
364 views
Jun 23 2017 (12:49)
Science is better than Engineering and Technology*^~   14084 blog posts   2 correct pred (100% accurate)
Re# 2329344-21            Tags   Past Edits
2S LHB coaches manufacuturing kammi athan reason

  
343 views
Jun 23 2017 (13:02)
TN Mainline should be electrified till tpj   368 blog posts   29 correct pred (69% accurate)
Re# 2329344-22            Tags   Past Edits
Kammi illa bro athula vara revenue kammi sollunga,avalo kaasu seluvu panni revenue kammiya varambola,so manufacturing kammi

  
296 views
Jun 23 2017 (14:25)
Science is better than Engineering and Technology*^~   14084 blog posts   2 correct pred (100% accurate)
Re# 2329344-23            Tags   Past Edits
115 -122 seats varum LHBla. still problemna ena artham,...

  
246 views
Jun 23 2017 (15:39)
TN Mainline should be electrified till tpj   368 blog posts   29 correct pred (69% accurate)
Re# 2329344-24            Tags   Past Edits
Varumthan,coaches kammi agum, then what may b reason for less producing 2s.
  
★  Rail Fanning
0 Followers
350 views
Jun 22 2017 (08:05)   12722/Dakshin SF Express (PT) | ET/Itarsi Junction (8 PFs) | BIA/WAG-9H/31375

ET™~   2286 blog posts   37 correct pred (75% accurate)
Entry# 2328603            Tags   Past Edits
Offlink BHILAI WAG-9H hauling 12722 Nizamuddin - Hyderabad Dakshin Sf Express arriving itarsi junction on platform number -3
Captured yesterday
  
Rail Fanning
0 Followers
127 views
Today (07:58)   12650/Karnataka Sampark Kranti Express (Via Kacheguda) (PT) | HBJ/Bhopal HabibGanj (5 PFs) | LGD/WAP-7/30272

ET™~   2286 blog posts   37 correct pred (75% accurate)
Entry# 2332970            Tags   Past Edits
LGD WAP-7 12650 Karnataka Sampark Kranti Trashing Habibganj
  
Rail News
0 Followers
9 views
New Facilities/TechnologyKM/Kolkata Metro  -  
Jun 11 2016 (05:20)   Bengal role key to Rail track plans in the state: Suresh Prabhu

Baaz SGUJ WDP4~   118 news posts
Entry# 2333625   News Entry# 270620         Tags   Past Edits
Railway Minister commissions maiden first rehabilitated NGEF Metro Rake into commercial service at Dum Dum. Also inaugurates Coach Manufacturing Unit in West Bengal. Prabhu stresses upon increasing Railways infrastructure in the State!
Kolkata: Indian Railways is banking on joint ventures with state governments to meet its ambitious target of laying down tracks that will sustain high economic growth.
Railway minister Suresh Prabhu today said the target for 2018-19 was 19km of tracks daily against 7km daily in the last fiscal.
Prabhu
...
more...
said in the last six years the pace of commissioning of such broad gauge tracks was an average 4.3km per day.
The ministry is eyeing a gradual increase in the rate to about 13km a day in 2017-18 and to 19km per day in 2018-19.
“The joint venture is a completely new corporate entity with independent corporate structure. There would be 50 per cent equity participation from the railways and the rest from the state governments,” said Prabhu on the sidelines of an interactive session at the MCC Chamber of Commerce and Industries.
The railway ministry has signed a memorandum of understanding to set up joint ventures with Maharashtra, Odisha, Andhra Pradesh, Kerala, Chhattisgarh, Telengana and Karnataka.
The railway budget for 2016-17 has proposed 13 projects at an investment of Rs 33,092 crore through joint ventures. Another 30 projects involving a cumulative cost of Rs 58,275 crore have been included in the capital investment programme of 2016-17. However, Bengal is not yet included in the list of identified projects to be executed through a joint venture.
The joint venture route gains importance as it helps to mobilise debt from banks, financial institutions and multilateral agencies by leveraging the equity. It could help to expedite the ongoing projects and new project development in the future.
Prabhu said the next phase of economic growth would be facilitated by the transportation sector, including the railways.
The ministry is working on high-speed railway projects that can increase the speed of transportation and reduce the cost.
A high-speed passenger corridor is also being set up between Ahmedabad and Mumbai with an assistance from the government of Japan.
Railway Board officials who accompanied Prabhu said the production of wagons was expected to start from the Rs 120-crore joint venture between public sector steel giant SAIL and Rail India Technical and Economic Services Ltd.
The joint venture is called SAIL-RITES Bengal Wagon Industry Pvt Ltd. It has signed an agreement for an assured offtake with the railway ministry in November 2015.
Suresh Prabhu commissions maiden rehabilitated Metro rake at Dum Dum
The first rehabilitated NGEF rake has been put into commercial service from Dum Dum Metro station today after inauguration of the same by Suresh Prabhakar Prabhu, minister for railways from Howrah station. A total of seven old NGEF rakes have been planned for rehabilitation.
The ‘AC look-alike’ rehabilitated rake has improved passenger amenities like all interior panels replaced with anodized aluminium panels similar to AC rakes, old passenger seats and backrests replaced with new ones of polycarbonate material, transparent glass partisan panels for the seats provided similar to AC rakes, all existing handrails replaced with new ones, existing aluminium chequered flooring replaced by fire resistance PVC flooring similar to AC rakes, spray painting of exterior of the coach by PU paint after removal of old layer of paint, dilapidated windows replaced by new modified windows and existing vestibules replaced by UIC type vestibules including transparent sheet to improve day light at the vestibule area.
Also brought into function were audio visual passenger information system along with provision of LED type passenger route indication board provided, LED based electrical head code in the driving motorman coaches, existing ventilation fans replaced by low noise fans having better air discharge facilities, LED based tube lights provided in place of fluorescent type of tube lights in coach and 100 per cent replacement of tough floor strengthening of body bolsters and replacement of side barrier, replacement of emergency door of driving motor coach.
Prabhu inaugurates Coach Manufacturing Unit in West Bengal
Railway Minister Suresh Prabhuon Thursday inaugurated a coach manufacturing unit at Budge Budge in West Bengal.
He stressed upon strengthening the total infrastructure of the Railways while speaking at the inauguration and laying of foundation stone of several projects of Eastern, South Eastern, Metro Railway and RITES.
A foot over bridge at Agarpara and Tilbhita stations and double line between Plassey and Beldanga stations and new line between Arambagh and Goghat were inaugurated by the minister.
He laid the foundation stone of Vivekananda Meditation Centre at Howrah.

  
10 views
Today (18:03)
sayangarai32   0 blog posts
Re# 2333625-1            Tags   Past Edits
Arambagh required so much train in office time
  
★★★  Rail Fanning
1 Followers
7919 views
Jan 17 2017 (15:39)   12355/Archana SF Express | PBH/Pratapgarh Junction (3 PFs)

★★★★Niket Karan★★★★^~   5396 blog posts   12 correct pred (100% accurate)
Entry# 2130330            Tags   Past Edits
Presenting some pics of Pratapgarh Jn . . .
Pics are of my journey from Patna to Bhopal with changeover at Pratapgarh In . . .
RJPB - PBH in 12355 Archana Exp
PBH - BPL in 12184 Pratapgarh Bhopal Exp
...
more...

3 posts - Jan 2017

2 posts - Sun Mar 05, 2017

1 posts - Mon Mar 13, 2017

  
3704 views
Mar 13 2017 (20:36)
speed up Jammu Rajdhani n halt at JRC n UMB~   1892 blog posts   143 correct pred (74% accurate)
Re# 2130330-10            Tags   Past Edits
See this brother

  
3756 views
Mar 14 2017 (06:36)
★★★★Niket Karan★★★★^~   5396 blog posts   12 correct pred (100% accurate)
Re# 2130330-11            Tags   Past Edits
Bas aise hi time pr chalti rahe. . .

  
3652 views
Mar 14 2017 (17:57)
speed up Jammu Rajdhani n halt at JRC n UMB~   1892 blog posts   143 correct pred (74% accurate)
Re# 2130330-13            Tags   Past Edits
Today also running Awesome 22min before time

  
2830 views
Mar 30 2017 (11:03)
★★★★Niket Karan★★★★^~   5396 blog posts   12 correct pred (100% accurate)
Re# 2130330-15            Tags   Past Edits
Story continues . . .

  
2776 views
Mar 30 2017 (12:34)
speed up Jammu Rajdhani n halt at JRC n UMB~   1892 blog posts   143 correct pred (74% accurate)
Re# 2130330-16            Tags   Past Edits
Bhai depends upon controlling too.... You can pass suggestions to DOMs of MB and LKO divisions.... Thank you This is what I can say....
Page#    297364 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Jul 6
Trains with ARP 15 Dep on: Tue Jul 11
Trains with ARP 30 Dep on: Wed Jul 26
Trains with ARP 120 Dep on: Tue Oct 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.