Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Apr 28, 2017 16:11:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Apr 28, 2017 16:11:30 IST

Blog Entry# 1015375  
Posted: Mar 06 2014 (12:26)

No Responses Yet
  
05
Station Tip
Amenities
0 Followers
1199 views
Mar 06 2014 (12:26)   SUR/Solapur (5 PFs)

AKGarg*   22845 blog posts   2010 correct pred (78% accurate)
Entry# 1015375            Tags   Past Edits
Watch the amenities till end.
*Waiting Rooms : For the bonafide passengers, three types of Waiting Rooms are provided including one Upper Class Waiting Room with AC, Sleeper Class Waiting Room and separate Waiting Room for ladies. Speakers are provided in all the Waiting rooms to listen the announcements made through PA system. Train indicators are also provided in Upper Class & Sleeper Class Waiting Room. A separate toilet for Handicapped passengers is provided in Upper Class Waiting Room. The Waiting Rooms are provided with adequate lights, fans and sitting arrangements.
*VIP Lounge
...
more...
: Well furnished air conditioned room with separate toilet facility is provided adjacent to Station Manager’s office for waiting VIPs including Ministers, MPs etc.
*Drinking Water : Drinking water arrangements are made on all the platforms. Thirteen (13) water coolers are provided for cold drinking water. Specially designed low height water stands are also provided to facilitate Handicapped passengers.
*Toilet & Urinal: General toilet blocks are provided on all the platforms. Bathing facility is available only on PF No.1. For the maintenance and upkeepness the toilet block on PF No.1, 2 & 3 is outsourced. The tariff is as below :-
Sr. No. Description Rates (Rs)
1 Urinal Free
2 Toilet Rs. 1/-
3 Bathroom Rs. 2/-
*Cloak Room : For depositing passenger luggage like Trunks, Suitcases etc. are accepted in locked condition in the Cloak room. The charges are as under :-
Tariff for Cloak Room Service Per Package
a) For first 24 hours or part thereof. Rs.10/-
b) Next 24 hours or part thereof. Rs.12/-
c) For each subsequent 24 hours or part thereof. Rs.15/-
*Foot Over Bridge/Ramp/Pathway : Two Foot Over Bridges connecting all the five platforms, Pathway connecting PF No.1 to PF No.2 &3/4 & 5, and a Ramp from Circulating area to main station building is provided to interchange the platforms and to facilitate movement of wheel chair/tri-cycle of Physically challenged Rail users.
*Wheel Chair : Wheel chairs are available with Dy. Station Manager on duty for the use of needy passengers at prescribed charges.
*Licensed Coolies : For the assistance of passengers, licensed coolies are deployed at station. The prescribed Portage charges are as under :-
Coolie charges Rs.
For Head load per trip (weight upto 40 kg) Rs.25/-
For wheeled barrows per two wheeled or four wheeled barrows (weight upto 160 kg) Rs.40/-
For carrying sick or disabled person- a) When carried by a wheeled chair or stretcher by two persons.
b) When carried by 4 persons. Rs.40/-
Rs.75/-
Waiting charges – First 30 minutes free. Next half hour or part thereof- Rs.25.00. Note:- The term head load means a quantity of one or more packages a man can reasonably be expected to carry i.e. weight upto 37/40 kg.
*****
Signage Signages : Standardized signages with approved colours indicating various offices, waiting rooms, retiring rooms, catering, drinking water, Foot Over Bridge, Wheel Chair, Stretcher etc. are provided on the platform for the guidance of Rail Users.
****
Information Boards : Train Time Table boards are provided in the concourse and Reservation office. Similarly, other informative boards indicating Passenger Fares, Refund Rules, Cloak Room charges, Retiring Room charges, Collie charges etc. are also exhibited at conspicuous places in the station premises for the guidance of Rail users.
Catering arrangements : Apart from “Jan Ahaar” managed by Railways, additional Tea/Coffee, Vegetarian Food Stall, Milk Stall, Fruit and Fruit Juice Stall run by contractors are provided on platform to meet the food requirements of the passengers.
Other Stalls : In addition to catering stalls, Book stall, Curio stall, STD booth are also provided on platform.
*Automatic Teller Machine : The following banks have provided ATM facility at Solapur station in the circulating area for the benefit of users.
• State Bank of India
• Canara Bank
• Punjab National Bank
*Parking : Adequate parking area with high Mast lighting arrangement for better illumination is provided in front of station building. Separate lanes are provided for Auto Rickshaw, four wheelers to avoid congestion and traffic jam. Pre-paid booth in coordination with local police is available at station. Parking stand is also provided at prescribed tariff as shown below :-
Sr. No. Type of Vehicle Charges (Rs) per 6 hours or part thereof
1 Cycle Rs.3/-
2 Two Wheelers Rs. 5/-
3 Four Wheelers Rs. 10/-
Premier parking facility is also provided in the demarcated area at the prescribed charges shown below :-
Sr. No. Type of Vehicle Charges (Rs)
1 Two Wheelers Rs.20/-
2 Four Wheelers Rs. 30/-
Note :- No vehicle should be parked beyond four hours under Premier parking..
*Assistance Booth : It is manned by Dy. Station Manager (Comml) round the clock for the assistance and guidance of passengers. A complaint-cum-suggestion book is available with him for the use of rail users.
*Security Arrangements : Personnel of Railway Protection Force and Govt. Railway Police are available at the station. A booth of RPF is provided on PF No.1 which is manned round the clock with CC TV facility. RPF and GRP station are available adjacent to Railway station.
*General Waiting Hall : For passengers holding unreserved tickets a General Waiting Hall with adequate sitting arrangements, lights & fans is provided adjacent to Booking office concourse. In addition sufficient Cover Over Shed with the provision of benches and sitting platforms are also provided on all the five platforms.
*Passenger Grievance : Complaint-cum-suggestion book is available at Dy. Station Manager (Comml), Reservation office, Parcel office, Head TC office and all Ticket Checking staff while performing duties in trains.
*Passenger can send their feedback through SMS feed back No.9004411111.
They can even send e-mail through srdcm@sur.railnet.gov.in.
Even complaint can be written to Senior Divisional Commercial Manager, Divisional Railway Manager’s Office, Central Railway, Solapur, - 413001 (Maharashtra).

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon May 8
Trains with ARP 15 Dep on: Sat May 13
Trains with ARP 30 Dep on: Sun May 28
Trains with ARP 120 Dep on: Sat Aug 26

  
  

Rail News

  • Earnings Misses, Rising Debts: Indian Railways Turnaround Hits Buffers – NDTV Profit  News Entry# 301047
    by: Jayashree ❖ Amita*^  Today (16:01)


    Ghaziabad: India's mammoth state railways, much of them stuck in colonial times, have missed earnings targets for the third straight year and debts have shot up, documents seen by Reuters show, raising doubts about an ambitious modernisation drive.
    PM...
  • Trains on Mumbai central railway line delayed, second time in a week | mumbai news  News Entry# 301046
    by: Jayashree ❖ Amita*^  Today (16:01)


    Trains on Mumbai’s central railway line were delayed after a portion of the tracks between Kalyan and Thakurli stations was damaged—the second such incident this week.
    Trains...
  • इरिमी में आयोजित हुआ 62वां रेल सप्ताह समारोह  News Entry# 301045
    by: amishkumar48~  Today (14:07)


    जमालपुर : भारतीय रेल यांत्रिक एवं विद्युत अभियंत्रण संस्थान (इरिमी) में गुरुवार को 62वां रेल सप्ताह समारोह का आयोजन हुआ. समारोह का उदघाटन मुख्य अतिथि निर्देशक गजानन मल्लया तथा विशिष्ट अतिथि बी जयंती मल्लया ने संयुक्त रूप से दीप प्रज्ववलित कर किया. निर्देशक ने कहा कि वर्ष 1953 में पहली बार...
  • New Platform At MAQ in 2018-19 Palakkad division moots more passenger amenities at Mangaluru Central  News Entry# 301044
    by: Southern Railway^~  Today (13:44)


    : Construction of 14 bays of platform shelter on platform 2/3 and platform 1 at Mangaluru central station is in progress and will be completed this year, noted Naresh Lalwani, divisional railway manager, Palakkad division. In addition, new toilet blocks will also be constructed at platform 2/3. Repairs to road from...
  • मराठीसाठी पश्चिम रेल्वेचे पाऊल  News Entry# 301043
    by: x^~  Today (12:50)


    मीरारोड, दि. 23 - मुंबई व पश्चिम उपनगरीय रेल्वे स्थानकांच्या मराठी नावांची माहिती पश्चिम रेल्वेच्या वाणिज्य विभागाने मुंबई, मुंबई उपनगर व ठाणे जिल्ह्याच्या जिल्हाधिकारी कार्यालयां कडुन मागीतली आहे. काही रेल्वे स्थानकांचा अमराठी भाषेतुन अपभ्रंष व चुकीचा उल्लेख होत असल्याच्या तक्रारी व आंदोलने होत असल्याने रेल्वे प्रशासनाने देखील सकारात्माक पाऊल उचलले आहे....

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site