What will d controller do in this situation??
Supposingly the Duronto arrives Madgaon at 11:45 am, 45 min behind schedule.. The time that Duronto should leave Madgaon after its technical halt is 12:40 pm..
There is a Mumbai bound Jan Shatabdi which has to leave Madgaon at 12:10 pm n which has to reach Mumbai before Duronto..
Now what shall d controllers do.....
more... We all know Durontos timings at Technical halts can be altered, as it is not a commercial stoppage..
So, what will controllers do now..
A) Give a green Signal to Duronto after a 10 min technical halt..
B) Stop d Duronto at Madgaon for 55 min till the clock ticks 12:40..
C) It will leave Madgaon right behind Mumbai bound Jan Shatabdi
Jan departs Madgaon at 12:10 n Arrives Dadar at 23:05..
Duronto should depart Madgaon at 12:40 n Arrive LTT at 23:55.
Situation is live
click here