DN Amravathi Exp arrived actually on 00:05 that to on PF 14 (ER side) where as NTES shows that it arrived at 22:40. Surprisingly it was bang on time at SRC and got heavily delayed in between HWH-SRC. It was hauled by LGD P4 #22744. Where as UP Amravathi left almost on time with a LGD P4 #22264.