Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 19:48:08 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 19:48:08 IST

Blog Entry# 1280948  
Posted: Nov 19 2014 (14:47)

1 Responses
Last Response: Jul 02 2015 (16:48)
  
024
Train Tip
Toilet/Water/Cleanliness
0 Followers
7330 views
Nov 19 2014 (14:47)   22403/Puducherry - New Delhi SF Express

RF Z ▶NEVER BOARD A MOVING TRAIN◀*^~   11169 blog posts   2560 correct pred (83% accurate)
Entry# 1280948            Tags   Past Edits
When rake cleanliness, maintenance and availability of proper catering is the topic of discussion, three trains of Northern Railways, Delhi division are significantly aweful:
14003/04 NDLS-MLDT-NDLS Exp
22403/04 NDLS-PDY-NDLS Exp
14035/36 Dhauladhar Exp
.
Salient
...
more...
features of these trains (applies mostly to sleeper class):
1) Availability of catering is dubious. Though Dhauladhar doesn't need it but absence of catering in NDLS-PDY is a torcher. Similarly though NDLS-MLDT claims to have catering, I, at times found it missing. Plan accordingly. Bring your own food.
2) Toilets. HORRIBLE. No cleanliness, nothing. (Now I can't even say bring your own toilet)
3) Designation of coach numbers is not proper. The coach that says 'S5' may not be 'S5'. The coach on which the chart of S5 is stuck is S5. Frustration inducing negligence at its apex, isn't it?
4) Rakes are extremely dirty and ill-maintained.
5) Charging points: Well after reading point 1 through point 4, you're intelligent enough to predict. If you get one, you're one of the lucky chosen ones.

  
Jul 02 2015 (16:48)
Aditya Kaushal   273 blog posts   131 correct pred (69% accurate)
Re# 1280948-1            Tags   Past Edits
Agreed Hands Down But Dhauladhar Express is Still Much Much Better Than These Two Trains..................:)

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site