Reason for change in Schedule and delay in Train Running status
After change of depature time of Simhapuri express 12709 from 21.00 to 22.10 hrs the train was handed over to SC division on most of the occasions in the RT or 15 to 20mins late as per statistics taken for month of Dec 2014. Only 9 times the train was handed over beyond 30minutes late to SC division.This is also due to late running of the express trains taken over from MAS and GTL divisions.
The...
more... change in depature time was effected due to change in arrival and depature timings of 17209 SBC-CCT express whch arrive earlier ar 21.45 hrs and advanced to 20.05hrs to gudur station as a arrangement with the other railways and to meet the terminal constraint at SBC.It is also proposed to avaoid detention of trains at home signals for want of pf at gudur station.
In addition to some late running trains are also to be dealt and goods trains are to be moved which givs more earnings for railways than public exchequer.