Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode
 
Fri Mar 29 13:25:51 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1380619
Posted: Feb 26 2015 (17:28)

18 Responses
Last Response: Feb 27 2015 (12:46)
2 Followers
Rail Budget
6543 views
4

Feb 26 2015 (17:28)   BZA/Vijayawada Junction (10 PFs)
 
Truth finder~
Truth finder~   13814 blog posts
Entry# 1380619            Tags  
Unbelievable !!
3 rd line between Duvvada - Vijayawada, Vijayawada- Gudur sanctioned.
Duvvada-Vijayawada given 76 crs this year, Vijayawada - Gudur 56 crs
Vijayawada - Kazipet 3 rd line given 100 crs. Awesome allocations.
Most
...
more...
of single lines of AP going to be doubled also.

Translate to English
Translate to Hindi
Show AI Response

13 Posts

1891 views
0

Feb 26 2015 (21:07)
selvasssm^~
selvasssm^~   5619 blog posts
Re# 1380619-14              
Gudur-NDLS will have 3/4 lines as per pink book projects and fund allocation.
Only MAS-Gudur i.e. Ennore-Gudur 3rd line missing in MAS-NDLS trunk route.
Translate to English
Translate to Hindi
Show AI Response

2376 views
0

Feb 27 2015 (10:05)
Truth finder~   13814 blog posts
Re# 1380619-15              
Even MAS-HWH also going to have 3/4 lines as per fund allocations.
Translate to English
Translate to Hindi
Show AI Response

2314 views
0

Feb 27 2015 (10:47)
RFIR~
RFIR~   6812 blog posts
Re# 1380619-16              
I saw the link. It was mentioned Viziangram-Sambalpur 3rd line. Maybe a typo since doubling itself is not completed or is it that both the works of 2nd and 3rd line will be done parallely.
Translate to English
Translate to Hindi
Show AI Response

2343 views
0

Feb 27 2015 (11:25)
Truth finder~   13814 blog posts
Re# 1380619-17              
Vijayanagaram to Tiltlagarh doubling over. So mentioned as 3 rd line. Now doubling and tripling will be done simultaneously
Translate to English
Translate to Hindi
Show AI Response

2117 views
0

Feb 27 2015 (12:46)
RFIR~
RFIR~   6812 blog posts
Re# 1380619-18              
Thats good. Since doubling is done in VZM-Titlagarh probably the railways can look to speed up trains in this section. I thinkl some of the train still run with the timings that were formulated when single line was in operation.
Translate to English
Translate to Hindi
Show AI Response

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy