Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 07:00:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 07:00:36 IST

Blog Entry# 1476130  
Posted: May 19 2015 (23:33)

1 Responses
Last Response: Jun 09 2016 (14:30)
  
01
Station Tip
Amenities
0 Followers
3156 views
May 19 2015 (23:33)   KCG/Hyderabad Kacheguda (5 PFs)

RAVISEETHA   415 blog posts   987 correct pred (61% accurate)
Entry# 1476130            Tags   Past Edits
Kacheguda is an important station with a number of important trains either passing through or terminating/originating from there. During recent trip I was shocked to find that the station does not have a full fledged cloak room to keep luggages. I was directed to the parcel office, fairly away from main platform, where there is limited facility of accepting luggage, which is closed from around 7 PM till 5 AM. This is what the gentleman manning the place informed when I wanted to keep my luggages from 7.30 PM to 1.00 AM, when my train was at about 1.30 AM.

  
2094 views
Jun 09 2016 (14:30)
Koo Koo Theevandi   145 blog posts   729 correct pred (80% accurate)
Re# 1476130-1            Tags   Past Edits
My train was @ 7 PM in the evening,. I had reached the Station around 12.30. I had gone to Parcel office to keep my luggage. They had rejected it because I din't have my bag locked. There is a shop right outside the station where you will get the lock for Rs.20. I got the lock and again went there to keep my luggage. They had informed me to take my luggage before 7 PM as they will close the cloak room by that time. So I kept it there, then gone back and sat in Cafe Coffee Day for next 5 hours. It was totally empty with 2 or 3 people came in between

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site