Please don't ask extension for this highly patronized train.Visakha was extended to PSA from VSKP and then Uttarandhra lost the train as it was extended to BBS. If Godavari is extended also, same thing will happen. In the end, both Uttarandhra and VSKP won't have train to SC. Some political pressure is required to prevent Uttarandhra trains from being extended to BBS and Odisha. Until the local leaders start fighting, no mater which train is extended to VZM/PSA, it will be extended to Odisha.