Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Apr 25 10:17:30 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1547496
Posted: Jul 22 2015 (11:15)

No Responses Yet
General Travel
1609 views
0

Jul 22 2015 (11:15)   ET/Itarsi Junction (8 PFs)
 
SMurali Dharan
SMurali Dharan   14 blog posts
Entry# 1547496            Tags   Past Edits
Press Information Bureau
Government of India
Ministry of Railways
21-July-2015 19:50 IST
The New Signaling Control Room starts functioning at Itarsi Railway Station in Madhya Pradesh.
The
...
more...
34 day- long major disruption in Train movement via Itarsi becomes normal.
Big relief to passengers travelling North-South and East-West within country.

The new Route Relay Interlocking (RRI) panel at Itarsi Railway Station in Madhya Pradesh has started functioning at 14:50 hrs on 21.07.2015. As a result of the functioning of the new RRI, train movement via Itarsi is now becoming normal which was badly disrupted for the last 34 days. However, very few trains will still remain cancelled for next 2 – 3 days due to rake imbalance on account of sudden cancellation of trains. Only 15 trains will be cancelled on 22nd July 2015 and only 11 trains will be cancelled on 23rd July 2015.
Itarsi is a critical 4 directional junction station/yard, in Bhopal Division of West Central Railway. Itarsi situated strategically in the central part of India linking North-South and East-West parts of India through trains. Itarsi is the critical junction station on Bombay-Bhopal, Bhopal-Nagpur and Bombay-Jabalpur-Allahabad route.
It may be recalled that on 17.06.2015, an incidence of major fire occurred at the Route Relay Interlocking (RRI) Panel at Itarsi station fully destroying the existing RRI installation. Signalling Relay Room system is a system by which all the signals and the points/crossings which are used for changing of routes at junction station are operated centrally from a cabin through electrical devices. As a result, complete automatic train operation at Itarsi Station was disrupted leading to severe detention to trains passing across Itarsi Station.
As per normal schedule, about 145 scheduled Mail Express and Passenger trains and 50-60 freight trains are dealt with at Itarsi station in UP and DN directions. The destruction of RRI immediately resulted in much reduced running of only 35 trains per day via Itarsi through manual operation, However within 3 days time, Railway Engineers and Technicians worked round the clock and a temporary panel was installed which enabled handling of 110-120 trains per day in place of 35 trains per day with manual operation. This, although an interim arrangement, provided substantial relief to train operations. There was long detention to trains as the route for all passing trains had to be manually set and verified for safe passage at Itarsi yard. This resulted in 50% reduction in train handling capacity at Itarsi.
The situation warranted cancellation/diversion/short termination of trains for smooth and safe operations. Consequently, trains had to be cancelled due to operational and safety constraints.
Summary of the train services cancelled, diverted and short terminated till 21.07.2015 is given below:
Date Scheduled trains via Itarsi Cancelled Short terminated Diverted
17.06.2015 to21.07.2015 5016 2404 17 259

Indian Railway took a decision to stall a new RRI panel room and started work on a war footing deploying a substantial number of officers and staff. . For this very complex, giant and high-tech task, teams of competent officers and staff from West Central Railway, As well as from other zonal railways were mobilized at lightning speed to enable round the clock working across full spectrum of activities. At one point of time there were as many as 1000 officers, supervisors, technicians and other staff working for the commissioning of the RRI round the clock. With as many activities in parallel, as possible, to squeeze the time frame to minimum, the target date for commissioning of new RRI was fixed as 23/7/15. And, WCR has succeeded in commissioning it two days earlier i.e. on 21/7/15.
The work was supervised and monitored intensely at Railway Board level, Zonal Railway (WCR) level, Division (Bhopal) level.The Railway Minister Shri. Suresh Prabhakar Prabhu personally monitored and sought regular reports about the progress of the work. Senior Railway Board officials from Delhi visited Itarsi to supervise the work. GM, WCR and DRM Bhopal had to personally camp at the site to ensure expeditious completion of this work.
New RRI incorporates important yard remodelling which will further eases the flow of traffic and flexibility in yard operations and handling of trains with 24 coaches. Multi Section Digital Axle Counters will increase the system availability during monsoon season. Fire alarm system has been provided and fire suppression system is being planned to avoid such fire incidences in future.
The mammoth installation of this new RRI system consists of 700Km of underground cables, 108 points, 78(Main-42 & Shunt-36) signals, 144 detection points of digital axle counters forming 89 track sections, 32 track circuits, 9000 relays, 60000 jumpers of length more than 200Km and more that 2 lakh wire connections.
After completion of physical work, testing of such an installation was a challenge and a critical path for its commissioning. Due to safety considerations, the testing was to be comprehensive. Any small error in connection could become a potential safety threat; hence, there was no choice but to do comprehensive testing even during such challenging situations of time shortage. This challenge was met by employing the best human resource at all levels round the clock, carrying many activities simultaneously and very close monitoring at several levels.
****
AKS/MKV/MN

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy