Don't go by the figures mentioned in the monthly electric loco holding file. If 4 WAP-5,s were rolled out in Sep-16 and 2 in Oct-16 then they would have been updated in the portal. I don't think that there are 6 WAP-5,s waiting at CLW for shed allocation. They hardly have that much area to hold locos once produced.