Why was it having a loco change @ SRR; that too from DSL to DSL, both belonging to DLS/ERS?
Have seen trains originating @ KCVL/TVC being hauled till SRR by Electric loco and Diesels taking charge from there(like Nethravati Express). But this loco change looks odd; some technical issue with first loco?