Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jun 23, 2017 22:55:58 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jun 23, 2017 22:55:58 IST

Blog Entry# 1781451  
Posted: Mar 27 2016 (16:25)

No Responses Yet
  
Rail Fanning
0 Followers
349 views
Mar 27 2016 (16:25)  
 

Kishor*^~   4648 blog posts   123 correct pred (63% accurate)
Entry# 1781451            Tags   Past Edits
click here
What started out as a leap for Railways into the elite semi-high speed train club is turning out to be a tiny crawl.
The flagship Gatimaan Express between New Delhi and Agra, to be launched as India’s fastest train service at a top speed of 160 km per hour, will in fact be only a few minutes quicker than — if not just about as fast as — the first Shatabdi Express launched as the fastest train in India 28 years ago.
The
...
more...
first Shatabdi Express, rolled out between New Delhi and Jhansi in 1988 by then railway minister Madhavrao Scindia to commemorate the centenary birth celebrations of Jawaharlal Nehru, took 115 minutes to reach Agra, Railway archives show.
The Gatimaan Express, with three decades worth of advancement in railway technologies and a good two years of work into it, would take 113 minutes to reach the Taj Mahal city — as per its latest, and what is being touted as its final, trial before launch.
At its inception, it was planned that Gatimaan would cover the Delhi-Agra distance in 90 minutes. This was significantly lower than the 117 minutes the Bhopal Shatabdi — currently the fastest train with top speed of 150 kmph (permissible up to 155 kmph) — takes between the two cities.
While the aim was later revised to under 100 minutes, in subsequent trials, the Gatimaan timing between the two cities was further stretched to 105 minutes, as per records reviewed by The Sunday Express. Of late, the Railways had been aiming for 110 minutes — just a seven-minute gain from the Bhopal Shatabdi.
While March 31 was a tentative launch date for the semi-high speed train, that could not be put off now till all the glitches have been weeded out and the Gatimaan is able to clock a time less embarrassing than what it is doing.
Last year there had been talk of Prime Minister Narendra Modi flagging off the train.
Officials involved with the project say that the reasons the Railways is struggling to bring down the travel time — despite 28 years of technical advances, an engine capable of clocking 200 kmph and a train carrying less coaches than a traditional Shatabdi — are not technical. They are much more basic.
The fundamental flaw in planning was the assumption that the train could maintain a speed of 160 kmph for most of its journey on a track which is not even an exclusive corridor.
In fact, the 195-km stretch from New Delhi to Agra has 19 ‘caution points’. Which means that 19 times during its short run, the train needs to reduce its speed, sometimes to as low as 60-70 kmph, even if for a few seconds. This is after weeding out of many more such traditional caution points on the route for the train. The Gatimaan loses 1.5-2 minutes each time it decelerates and then accelerates again.
The majority of the caution points involve curves, bridges and populated sections. And then there are dynamic caution points as well on account of ongoing works. Curves eat into time, while populated areas have heavy speed restrictions imposed by the Commissioner of Railway Safety (CRS).
“Wherever in the world you see high-speed trains, they are on straight tracks. They avoid curves. But that’s not the case on this route. And each curve takes away speed,” A K Mital, Chairman, Railway Board, told The Sunday Express.
The Railways could still set a strict 90-minute target for the Gatimaan, he added, if it departed from Hazrat Nizamuddin Station in the Capital instead of New Delhi. “But then that’s not the same as starting it from New Delhi, which is the prime station of the Capital. The train loses around 10-15 minutes only to go to Nizamuddin from New Delhi. So from New Delhi we are aiming for 110 minutes,” he said.
Another major hurdle is the Mathura Yard of the Railways that is enroute. The signalling system there needs to be upgraded and made more seamless for the train to not slow down too much.
The Railways has been generous with funds for the track and signalling upgrade already carried out for the prestige product. The Northern Railway, that manages just a 58-km stretch between Delhi and Palwal, has spent Rs 60 crore so far and is slated to spend another Rs 15 crore. The North Central Railway has spent much more.
Former Railway Board chairman Arunendra Kumar, who conceived the project, said while the 90-minute target was “well within reach”, factors came in the way. “We are dealing with numerous speed restrictions because we wanted to gain the top speed speed in the existing infrastructure without compromising safety.”

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jul 3
Trains with ARP 15 Dep on: Sat Jul 8
Trains with ARP 30 Dep on: Sun Jul 23
Trains with ARP 120 Dep on: Sat Oct 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.