Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Feb 25, 2017 03:25:13 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Feb 25, 2017 03:25:13 IST

Blog Entry# 1782331  
Posted: Mar 28 2016 (15:09)

2 Responses
Last Response: Mar 28 2016 (15:35)
  
Rail News
0 Followers
690 views
NFR/Northeast Frontier  -  
Mar 28 2016 (15:07)   Sudden splash of rain collapsed 800 metre long Platform at Dharmanagar railway station : use of poor quality material allegedly led to this disastrous
 

deepakrashikendra   257 news posts
Entry# 1782331   News Entry# 262697         Tags   Past Edits
AGARTALA, March 28 (TIWN): A few hours of moderate rain on Monday morning has collapsed the 800 meter long boundary wall of the Dharmanagar railway platform which has created much turmoil among the common people. Reportedly, Dharmanagar railway station was earlier alleged of using poor material in the construction work, due to bad maintenance and lack of supervision under the observation of Engineer Chittaranjan Paul. With the collapse of railway platform resentment has brewed among the common people of Dharmannagar. Reportedly, 2 high officials including DCM B.K.Misra, R . K Mandal DOM visited here in Dharmanagar rail station on Saturday as a part of inspection and took a survey of various works. Sources said that officials expressed displeasure about the track works and also other ongoing works. Many works however still not over at Dharmanagar railway station including few tracks also. In compare to the Agartala rail station, Dharmanagar rail station...
more...
works are not progressing rapidly. Whereas all the railway works held in Tripura are in good shape but in Dharmanagar rail station the work was undergoing little slow and allegation were coming for poor construction work, until the North Eastern officials had inspected the rail station.From control room to the tracks laid at there had been inspected, but they expressed displeasure after the inspection.
However allegation has also raised earlier by the locals that the filling work which was going on at that station seemed of poor quality. Due to lack of proper observation the working quality has became low.
Moreover, many parts of the Dharmanagar railway station, which were constructed long back ,tracks are suffering from lack of maintenance. However, after the inspection the worker now has speeded up their works and the works are going in full swing.
Today with the collapse of Railway platform huge resentment has raised among the local
-

  
1784 views
Mar 28 2016 (15:09)
deepakrashikendra   900 blog posts
Re# 1782331-1            Tags   Past Edits
standard construction practices are not being followed.

  
1792 views
Mar 28 2016 (15:35)
Kishor*^~   4571 blog posts   123 correct pred (62% accurate)
Re# 1782331-2            Tags   Past Edits
When Standard Corruption Practices are followed, Contractor has to forego Construction Practice

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Mar 7
Trains with ARP 15 Dep on: Sun Mar 12
Trains with ARP 30 Dep on: Mon Mar 27
Trains with ARP 120 Dep on: Sun Jun 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site