Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Feb 24, 2017 00:35:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Feb 24, 2017 00:35:33 IST

Blog Entry# 1782811  
Posted: Mar 28 2016 (23:58)

1 Responses
Last Response: Mar 29 2016 (00:05)
  
General Travel
0 Followers
4852 views
Mar 28 2016 (23:58)   18309/Nagavali Express | EE/Eluru (3 PFs)
 

Pavankumar2717~   5514 blog posts   401 correct pred (76% accurate)
Entry# 1782811            Tags   Past Edits
Travelled in this train last night from EE-SC..train arrived EE 35mins late nd left after 2mins halt nd blasted at MPS after leaving EE till MBD which is 12 kms from BZA then it's slowed down.. the time we reached BZA home signal 12783 VSKP-SC AC SF also waiting for clearance at BZA outer on the other line..Both trains got clearance at same and entered parallel to the BZA platform...12783 arrived on PF7 18309 arrived on PF5...at 01:25...After 5mins BSP-MAS SF arrived on PF6...12615 GT arrived at 01:40(15mins before)...12783 left at 01:50 and we were made to wait...at 02:05 we got the starter ahead of GT I thought SCR will allow GT OT at BZA itself but they didn't...I slept after that...took almost 2hrs for last 60kms...reached SC at9:50...on PF6..50mins late...even Simhapuri yet to arrive from GDR...

  
Mar 29 2016 (00:05)
Pavankumar2717~   5514 blog posts   401 correct pred (76% accurate)
Re# 1782811-1            Tags   Past Edits
Even though it doesn't have any stops en route this train(18309) gets less priority...took 7hrs 45mins from BZA-SC with 1 halt ..even Super crawler golkonda runs faster than this....at least 1hr running time can be cut down in b/w BZA-SC...no need to give overtakes for GT GR Simhapuri....

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 6
Trains with ARP 15 Dep on: Sat Mar 11
Trains with ARP 30 Dep on: Sun Mar 26
Trains with ARP 120 Dep on: Sat Jun 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site