Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Mar 29, 2017 09:34:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Mar 29, 2017 09:34:59 IST

Blog Entry# 1783339  
Posted: Mar 29 2016 (13:44)

7 Responses
Last Response: Mar 31 2016 (23:46)
  
★  General Travel
0 Followers
4036 views
Mar 29 2016 (13:44)   13351/Dhanbad - Alappuzha Express (PT) | DHN/Dhanbad Junction (8 PFs)
 

nilabh89~   277 blog posts   2103 correct pred (95% accurate)
Entry# 1783339            Tags   Past Edits
It is a great move by the railways to introduce an extra 3AC in Tata-Alleppey exp considering the popularity of this train.......now its time that Dhanbad division should also consider this and add an extra 3ac in the Dhanbad-Alleppey rake............this train like its slip rake runs jam packed throughout the year & is the sole connectivity between Dhanbad,bokaro,ranchi to southernmost parts of India.......Just 1 3ac is insufficient to cater to such a large pool of passengers.......therefore the need of the hour is that an extra 3ac would be very much of a relief to tourists & patients travelling south..........suggestions welcome........

2 posts - Tue Mar 29, 2016

  
Mar 31 2016 (12:04)
Rail Fanning~   2612 blog posts
Re# 1783339-3            Tags   Past Edits
Yes agree with the same. Ideal solution is to separate the trains. The railways have been constantly rejecting this proposal and it could be due to some of the following challenges faced
• Availability of rakes. At least 6 rakes in each of the trains required.
• Getting the right time table slot for each of the trains separately since it travels through so many diff zones. It is almost like starting a new daily train !!!
• Since
...
more...
these 2 trains already run daily and that too for such a long distance, it will present another additional challenge. Had the trains been bi weekly or tri weekly, it may not have so much of issues but getting 2 separate daily trains and that too with separate time slots is always a challenge

  
2477 views
Mar 31 2016 (13:41)
docdiablo23*^~   1117 blog posts   4787 correct pred (77% accurate)
Re# 1783339-4            Tags   Past Edits
The Dhanbad one can run on the existing route while the TATA slip can be made to run via Kharagpur-BBSR-VSKP...
The proposal was there for many years but still yet to see the light of the day. The maintenance standards of these trains have to improve too.

  
2379 views
Mar 31 2016 (14:54)
Rail Fanning~   2612 blog posts
Re# 1783339-5            Tags   Past Edits
Yes this proposal was there for long. I have heard another version from one of the pantry staff once wherein it was said while the DHN-Allp will continue with its existing run, the Tata Allp train was proposed to be extended till Trivandrum. One reason being mentioned for not having separate rakes was Tata lacking full fledged facility of a dedicated yard/pit line where multiple trains with more than 18-19 coaches can be stationed daily

  
3017 views
Mar 31 2016 (22:54)
nilabh89~   277 blog posts   2103 correct pred (95% accurate)
Re# 1783339-6            Tags   Past Edits
If delinking of the above trains is difficult then railways should try to start one bi weekly or weekly train from dhanbad through bokaro ranchi to south india with better speed & more coaches because the present train is just not able to cover the rush. ....

  
2889 views
Mar 31 2016 (23:46)
★★★★Niket Karan★★★★^~   5063 blog posts   12 correct pred (100% accurate)
Re# 1783339-7            Tags   Past Edits
Few months ago I had read in a newspaper about introduction of a new train between Hatia and Ernakulam but it's still not announced :(

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 8
Trains with ARP 15 Dep on: Thu Apr 13
Trains with ARP 30 Dep on: Fri Apr 28
Trains with ARP 120 Dep on: Thu Jul 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site