Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 07:38:47 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 07:38:47 IST

Blog Entry# 1835957  
Posted: May 07 2016 (00:41)

6 Responses
Last Response: May 07 2016 (12:12)
  
General Travel
0 Followers
3206 views
May 07 2016 (00:41)   15708/Amrapali Express
 

I m back~   4011 blog posts   37 correct pred (62% accurate)
Entry# 1835957            Tags   Past Edits
Should be made a sf by speeding up in gkp-kir section and should be made a 24 coacher with 1 extra 3ac and sl coach..

1 posts - Sat May 07, 2016

  
2840 views
May 07 2016 (01:36)
SGUJ GT46PAC 20015~   3040 blog posts   38 correct pred (73% accurate)
Re# 1835957-2            Tags   Past Edits
Yes.. 7 GN coaches are more than enough..it can be decresed to 5 with two more 3a coaches

  
2833 views
May 07 2016 (01:48)
A capella*^~   9372 blog posts   2458 correct pred (76% accurate)
Re# 1835957-3            Tags   Past Edits
There are 9 GS coaches
no, it can't be removed.. even after 9 gs coaches there is no space to place your toe inside GS coach.

  
2681 views
May 07 2016 (11:45)
I m back~   4011 blog posts   37 correct pred (62% accurate)
Re# 1835957-4            Tags   Past Edits
Then a biweekly jansadharan should run on this route but number of general coaches in Amrapali should be reduced..

  
2691 views
May 07 2016 (11:57)
Sharib~   1548 blog posts   21 correct pred (76% accurate)
Re# 1835957-5            Tags   Past Edits
Bhai sf ka tag hoga bs or extra khch nhi... ds train is doing good in his class..why do u want pay extra for d same service..

  
2674 views
May 07 2016 (12:12)
I m back~   4011 blog posts   37 correct pred (62% accurate)
Re# 1835957-6            Tags   Past Edits
This train is still following the old single non electrified line timetable like other trains on this route..so it should be now speeded up along with other trains running in the bbk-bju/kir section

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site