Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 21:28:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 21:28:26 IST

Blog Entry# 1885922  
Posted: Jun 08 2016 (19:49)

1 Responses
Last Response: Jun 08 2016 (19:49)
  
Rail News
0 Followers
576 views
Other NewsDMRC/Delhi Metro  -  
Jun 08 2016 (18:37)   Delhi Metro conducts initial trial runs between Kalindi Kunj, Okhla Vihar on Line 8
 

Jayashree ❖ Amita*^   35461 news posts
Entry# 1885922   News Entry# 270382         Tags   Past Edits
The Delhi Metro Rail Corporation (DMRC) today said the initial trial runs on the 3.5 km stretch between Kalindi Kunj Depot and the Okhla Vihar station of its Magenta Line (Line 8) (Janakpuri west to Botanical Garden) had started at a low speed.

During these trials, the interface of the Metro train will be checked to ensure that there is no physical infringement with civil infrastructure during the movement of the train on the track. Testing of various sub-systems of coaches will also be done, a press release from DMRC
...
more...
said.

Later on, in stages, the new signaling technology to be implemented on this corridor and Communication Based Train Control (CBTC) will also undergo rigorous testing, it said.

The response of the train at different speeds, braking of the train and the inter-connection with the Operations Control Centre (OCC) will also be monitored during the trials. The behavior of the track system and the Over Head Electrification (OHE) will be checked repeatedly, the release added.

According to the release, Line 8 will have a total length of 38 km, including the Kalindi Kunj – Botanical Garden portion of 3.494 km. It will have 25 stations, including ten elevated stations and 15 underground stations.

The line is expected to have an estimated ridership of 3, 61,356, and three train sets have already been received in the Kalindi Kunj Depot.

  
1726 views
Jun 08 2016 (19:49)
mushfiquekhalid^~   3450 blog posts   1915 correct pred (72% accurate)
Re# 1885922-1            Tags   Past Edits
Great to hear this new at last Line 8 could start in near time i guess by the end of this year

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site