Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 22:17:02 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 22:17:02 IST

Blog Entry# 1885946  
Posted: Jun 08 2016 (20:20)

5 Responses
Last Response: Jun 09 2016 (11:31)
  
General Travel
0 Followers
997 views
Jun 08 2016 (20:20)   BGP/Bhagalpur Junction (6 PFs)
 

™Smart City Bhagalpur ®~   1157 blog posts   20 correct pred (76% accurate)
Entry# 1885946            Tags   Past Edits
First the Electrification will start from Kiul side that is final,and 98 km distance between kiul and bhagalpur to be electrified will take 2 years by that time doubling between pirpathi and bhagalpur can easily be completed,Very important train runs between bhagalpur via kiul to delhi,mumbai etc that has loco change at kiul ,so at 1st phase kiul to bhagalpur must be electrified so that loco change time can be reduced,and we can reach via Garib Rath,Vikramshila,Bharamputra Mail,Ndls Bgp Express with Electric Engine without delay of loco change as kiul take more than 30 minutes for loco change which is quite frustrating when you are comming from long journey.

  
907 views
Jun 08 2016 (20:30)
Bhagalpur~   923 blog posts
Re# 1885946-1            Tags   Past Edits
That means Brahamaputra mail engine change in bhagalpur. Aur jab tak kiul bgp electrification hoga complete tab tak pirpanti bgp ka doubling complete ho jaiga. Then should from kiul to let to start the electrification work what do they should for waiting. Tell me.?

  
843 views
Jun 08 2016 (21:01)
™Smart City Bhagalpur ®~   1157 blog posts   20 correct pred (76% accurate)
Re# 1885946-2            Tags   Past Edits
for 1st few km pole erection has started but major work is set to begin from july onwards as fund is about to release.

  
789 views
Jun 08 2016 (22:04)
Bhagalpur~   923 blog posts
Re# 1885946-3            Tags   Past Edits
Means that poles erection started ..... please reply me.

  
662 views
Jun 09 2016 (05:48)
™Smart City Bhagalpur ®~   1157 blog posts   20 correct pred (76% accurate)
Re# 1885946-4            Tags   Past Edits
Yes but only few 1km work just began

  
569 views
Jun 09 2016 (11:31)
Bhagalpur~   923 blog posts
Re# 1885946-5            Tags   Past Edits
But the work has started now.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site