Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jun 26, 2017 23:19:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jun 26, 2017 23:19:59 IST

Blog Entry# 1937899  
Posted: Jul 22 2016 (17:11)

6 Responses
Last Response: Jul 22 2016 (17:18)
  
Social
0 Followers
1364 views
Jul 22 2016 (17:11)   HWH/WAP-4E/22573
 

بیپلوب کاگیونگ~   4722 blog posts   1685 correct pred (73% accurate)
Entry# 1937899            Tags   Past Edits
Indian Railways Electrification- Marching towards a better environment
TODAY · PUBLIC
#Introduction/Overview:
In rail budget 2016-17, Hon’ble Minister of Railways Suresh Prabhu, announced that Railways have increased the outlay for railway electrification by almost 50% and propose to electrify 2,000 kms in the present financial year. Hon’ble MR, while presenting the railway budget said that complete railway electrification will not only
...
more...
be environment friendly but also economical.

1 posts - Fri Jul 22, 2016

  
858 views
Jul 22 2016 (17:15)
بیپلوب کاگیونگ~   4722 blog posts   1685 correct pred (73% accurate)
Re# 1937899-2            Tags   Past Edits
Plan wise progress of electrification on IR
In the wake of industrial development in India and to cope with the growing traffic, electrification and dieselisation had to be introduced in the early 1960s. After the completion of the pre independence era i.e from 1925-1947, Indian Railways had electrified only 388 route-kilometres (rkm).
At the end of first Five Year Plan, Indian Railways had electrified 141 RKM was electrified. During the second plan, the electrification was extended up to 216 RKM. In the Third Plan, electrification was extended over another 1,678
...
more...
rkm. In the Annual, fourth, fifth, Inter-plan and sixth plan around 814, 953, 533, 195 and 1522 RKM respectively was electrified.
The pace of electrification was considerably speeded up and Indian Railways achieved progress of 2,812 rkm during the 7th Plan, 2,708 rkm during 8th Plan and 2,484 rkm during 9th Plan making a total of 16,001 rkm. In the 10th Plan, electrification of 1,810 rkm was achieved. In the recently concluded 11th Plan (2007–12) electrification of 4,556 rkm was achieved. By the end of 11th plan, 4556 RKM was electrified, increasing the cumulative number to 2224 RKM.
Six major trunk routes of the Golden Quadrilateral and diagonals i.e. Delhi — Mumbai via Central and Western Railways, Delhi — Chennai, Mumbai — Calcutta and Howrah—Chennai have already been fully electrified. Electrification of remaining Mumbai — Chennai Route (Nandalur — Pune) is in progress. A total of 1317, 1350, 1375, 1730 RKM in the financial years 2012-13, 2013-14, 2014-15 and 2015-16 was taken up for electrification respectively. According to the plan, a total of 2000, 2000, 2135 and 2135 RKM will be taken up for electrification in the years 2016-17, 2017-18, 2018-19 and 2019-20 respectively.

  
827 views
Jul 22 2016 (17:16)
بیپلوب کاگیونگ~   4722 blog posts   1685 correct pred (73% accurate)
Re# 1937899-3            Tags   Past Edits
Action Plan:
1. 18 New Electrification Projects included in Pink Book 2016-17 comprising 2569 RKM at a cost of Rs 2741 Crore, for which mandatory approvals and sanctions are in progress.
2. Electrification 24 Nos. railway routes (3276 RKM) have been included under Capital Investment Programme, through Joint Venture/SPVs/Partnership with State Government & Stake Holder, in Rail Budget 2016-17.
3.
...
more...
In lines of Hon’ble MR’s Budget pronouncement (2016-17), routes covering 11717 rkms have been identified for electrification through Extra Budgetary Resources (EBR) funding. Proposal for undertaking electrification of 72 Nos. routes have been processed for ‘In Principle’ approval of Board.

  
876 views
Jul 22 2016 (17:17)
بیپلوب کاگیونگ~   4722 blog posts   1685 correct pred (73% accurate)
Re# 1937899-4            Tags   Past Edits
PROJECT IMPLEMENTATION:
A number of steps have been taken by the Indian Railways to improve project delivery:
1. Bringing in Efficiency through modernisation in Railway Electrification: · Self-Propelled Wiring Train: for simultaneous stringing of Catenary and Contact Wires · Self-Propelled Multi Utility cum-Mast Erection Vehicle: for efficiency and reduction of Block time
2. EPC Contract on a pilot basis: Delhi-Rewari-Jaipur- Phulera-Ajmer
...
more...
RE work on EPC Contract Request-for- Proposal (RFP) opened on 02.05.16 at Central Organisation for Railway Electrification (CORE), Allahabad, and is presently under consideration.
3. Delegation of tender acceptance and sanction of detailed estimate power to General Managers
4. Implementation of Projects through Railway PSU
5. RVNL executing 300 RKM per year. Steps taken to enhance RVNL’s electrification output to 1000 RKM per year.
6. Creation of New Window for funding of Electrification Projects through Institutional Funding Mechanism.
New technological developments in electric traction:
1. 2X25,000 Volts OHE system against 25,000 Volt OHE system on Eastern and Western DFC to reduce number of TSS and increase number of trains in the section.
2. High rise OHE of 7.5 mts to carry double stack container traffic Western DFC
3. Intelligent Tower Car for predictive maintenance of OHE.
4. Mechanized Wiring Train for Railway Electrification

  
1114 views
Jul 22 2016 (17:18)
بیپلوب کاگیونگ~   4722 blog posts   1685 correct pred (73% accurate)
Re# 1937899-5            Tags   Past Edits
Achievements so far (2015-16):
1. Varanasi - Janghai Unchahar incl Phaphamau - Prayag Allahabad electrification commissioned.
2. Ghaziabad - Meerut - Saharanpur electrification commissioned.
3. New Delhi to Lucknow connected on electric traction via Moradabad- Ghaziabad - Moradabad electrification commissioned.
4.
...
more...
Electric traction reaches Mettupalayam: Coimbatore- Mettupalayam electrification commissioned.
5. Electric traction reaches Gorakhpur: Bhatni – Gorakhpur -Domingarh opened on electric traction. Gonda – Basti commissioned.
6. Domingarh – Basti to be commissioned shortly.
7. Alwar - Rewari electrification commissioned. With this Mathura -Alwar - Rewari is completed on electric traction.
8. Barauni - Mansi electrification commissioned Manmad - Daund via Shirdi connected on electric traction -Puntamba-Daund electrification completed.
9. Gooty – Dharamavaram electrification completed.
10. Laksar - Haridwar electrification completed.
11. Garwa Road - Meralgram electrification commissioned.
12. Kozikode - Kannur - Charvattur electrification commissioned.
13. Ib - Jharsuguda - Lapanga electrification commissioned.

  
827 views
Jul 22 2016 (17:18)
بیپلوب کاگیونگ~   4722 blog posts   1685 correct pred (73% accurate)
Re# 1937899-6            Tags   Past Edits
Other developments:
1. Electrification of Railway tracks to be made a NATIONAL MISSION for energy security & energy efficiency.
2. New Railway Electrification projects of about 10000 RKMs to be sanctioned in next three years. Availability of funds @ Rs. 3000-3500 Crores per annum should continue.
3. All port connectivity routes, DFC feeder routes, HDN routes, missing links
...
more...
are to be electrified.
4. Projects costing Rs. 1000 Crore and above should only be sent to NITI Aayog for In-Principle Approval.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Jul 6
Trains with ARP 15 Dep on: Tue Jul 11
Trains with ARP 30 Dep on: Wed Jul 26
Trains with ARP 120 Dep on: Tue Oct 24

  
  

Rail News

  • World's highest railway line coming up from Bilaspur to Leh via Manali in India  News Entry# 306582
    by: Ravi Raj Jr~  Today (22:40)


    Indian Railways is all set to begin the final location survey of the Bilaspur-Manali-Leh line at Leh in Jammu and Kashmir this week. The 498-km-long line will be the highest rail track in the world at an altitude of 3,300 metre.
    The...
  • Makeover exercise for Rajdhani, Shatabdi trains  News Entry# 306581
    by: Tushar Shandilya~  Today (22:35)


    NEW DELHI: Trolley service for catering, polite uniformed staff and on-board entertainment are some of the changes slated to be introduced in Rajdhani and Shatabdi trains from October this year.
    Aiming...
  • Improper use raises a stink inside train toilets  News Entry# 306580
    by: Tushar Shandilya~  Today (22:27)


    CHENNAI: On her way back to Chennai from Kochi recently, Reya Ajit Balan had a harrowing time on the train. She could not use the toilets as they were foul-smelling and had faeces floating on the commode. Ironically, a sticker inside the coach boasted that the train had environment-friendly biotoilets.
    Preventing...
  • पूर्वाचल राज्य के लिए रोकी ट्रेन  News Entry# 306579
    by: Tushar Shandilya~  Today (22:03)


    वाराणसी : पूर्वाचल राज्य के लिए रविवार को वाराणसी सिटी रेलवे स्टेशन पर जोरदार प्रदर्शन देखने को मिला। पूर्वाचल राज्य जनादोलन के सदस्य सारनाथ एक्सप्रेस के इंजन के आगे खड़े हो गए और नारेबाजी करने लगे। वहीं कई कार्यकर्ता ट्रैक पर पहुंचकर प्रदर्शन करने लगे। इसमें महिला कार्यकर्ता भी शामिल थीं।...
  • इंजन में फंसी नीलगाय, एक घंटा बाधित रहा ट्रैक  News Entry# 306578
    by: Tushar Shandilya~  Today (21:59)


    दादरी : हावड़ा-दिल्ली रेल मार्ग पर आमका फाटक के पास मालगाड़ी की टक्कर लगने से नीलगाय की मौत हो गई। साथ ही नीलगाय ट्रेन के इंजन में फंस गई। इससे मालगाड़ी रुक गई। जिस कारण लगभग एक घंटे तक ट्रैक बाधित रहा। नीलगाय को इंजन से निकालकर ट्रेन को आगे के...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...