Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jan 19, 2017 18:51:25 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jan 19, 2017 18:51:25 IST

Blog Entry# 1939312  
Posted: Jul 23 2016 (18:45)

15 Responses
Last Response: Jul 25 2016 (14:21)
  
Rail News
0 Followers
2454 views
New Facilities/TechnologySWR/South Western  -  
Jul 23 2016 (18:43)   Talgo tilting train to reduce commuting time between Bengaluru, Mysuru - The Hindu
 

Gopal*^~   3437 news posts
Entry# 1939312   News Entry# 274639         Tags   Past Edits
Talgo tilting train to reduce commuting time between Bengaluru, Mysuru Travel time between Bengaluru and Mysuru could be reduced to 90 minutes in the near future if trials with a high speed, tilting train manufactured by Spanish manufacturer Talgo conducted between Delhi and Mumbai in the next few days are successful.
Union Minister Suresh Prabhu on Saturday said that larger orders for the trains will be placed based upon the success of the trial run, which will likely begin from August 1. The train recently clocked 180 kmph this week between Mathura and Palwal during a trial run. “This technology will be cheaper as it can run on existing tracks. Since there are a lot of curves on the Bengaluru-Mysuru line, it
...
more...
will be better. We will start in a short time,” Mr. Prabhu said.
The state government had proposed the use of these trains on the route to reduce the travel time without having to create new infrastructure. Track doubling and electrification work on the line is almost completed. A major hurdle of shifting Tipu Sultan’s armoury taken up by US based company Wolfe Private Limited will also be completed soon. “In all probability, the project will be completed by year-end and tilting train coaches will be an added attraction on the track,” said R.V. Deshpande, Major Industries Minister, who also has the infrastructure portfolio.
Tilting train coaches are product of Talgo-the Spanish manufacturer of intercity, standard, and high speed trains. These coaches are light in weight and designed in a way that it can run on curves without decelerating. The Indian Railway recently conducted the first trial run in the stretch between Bareilly and Moradabad, as part of strategy to increase the speed of the trains, the minister explained.
Hurdles cleared for Hubballi-Ankola line
The disposing of cases related to the much delayed Hubbali-Ankola line by the National Green Tribunal (NGT) has come as a relief to the proponents of the line. The NGT asked the project proponents (Railways) to send a proposal to the State Government for further examination. Mr. Deshpande said that the State Government had requested the South-Western Railway to re-examine the extent of forest land required and to reduce it further in light of technological advancements.
As a result, Railways reduced the requirement of forest area from 667 hectares to 602 hectares. Further, the length of the tunnels and viaducts has been increased to protect the forest and wildlife. “Government will be submitting a fresh proposal to the Ministry of Environment, Forest and Climate Change,” Mr. Deshpande said.

2 posts - Sat Jul 23, 2016

8 posts - Sun Jul 24, 2016

  
1302 views
Jul 24 2016 (21:55)
ChandigarhJagadhariKarnalJindHansi Project~   1238 blog posts
Re# 1939312-11            Tags   Past Edits
Ho bhi Sakta h
Jab mai daily travel karta tha Chandigarh tab Himalayan Queen me Banker lagta to bhot baar dekha h but Kalka Shatabdi Ka dhyan se notice nai kia.
Mai sochta tha ki Kalka Shatabdi me bhi Chandigarh se banker lagta h.
Jaise 14095/6 me lagta h.

  
2058 views
Jul 25 2016 (00:10)
Ankit Sharma~   2127 blog posts   235 correct pred (69% accurate)
Re# 1939312-12            Tags   Past Edits
But I didn't said that it will require 2nd loco for cdg klk stretch

  
2466 views
Jul 25 2016 (00:35)
†★⚡ WAP5 ⚡★†   6040 blog posts   278 correct pred (90% accurate)
Re# 1939312-13            Tags   Past Edits
2 locos = 1 lead loco + 1 banker loco. Milta toh hai Kalka jaane wale trains ko. Ruling gradient is 1:50.

  
1789 views
Jul 25 2016 (14:18)
For Better Managed Indian Railways~   1859 blog posts
Re# 1939312-14            Tags   Past Edits
It is immaterial if KLK shatabdi has got banker or not, the Talgo train set has loco at each end for other technical reasons.

  
1784 views
Jul 25 2016 (14:21)
Ankit Sharma~   2127 blog posts   235 correct pred (69% accurate)
Re# 1939312-15            Tags   Past Edits
Talgo has its own locomotive.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jan 29
Trains with ARP 15 Dep on: Fri Feb 3
Trains with ARP 30 Dep on: Sat Feb 18
Trains with ARP 120 Dep on: Fri May 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2126247
    Jan 13 (11:57PM)


    Here are some guidelines for members regarding the new Report button and the revamped FM system: 1. If you have ANY complaint about a blog or ANY other issues, please USE the Report button and file a Complaint. Most complaints are resolved by FMs within seconds/minutes. (Some require further discussion). FMs have...
  • Entry# 2125399
    Jan 13 (08:58AM)


    Often we have some TL Entries seemingly in WaitList forever. Usually, the reason for this is that TLMs have already looked at the TL Entry but are not confident enough to Confirm it or are looking for more inputs from the Member regarding the source, etc. And this delay eventually causes...
  • Entry# 2122843
    Jan 10 (10:15PM)


    This is to address persistent and lingering questions about FM Appointments: . 1. Being an FM is a service. It is NOT supposed to be some kind of "reward" or "medal" to "deserving" members. The ULTIMATE OBJECTIVE of the process is to promptly handle/look into Reports filed by members, which is expected to...
  • Entry# 2115377
    Jan 04 (12:30AM)


    There are some changes to the Forum section. . The Objection feature is now completely GONE. We now only have a "Report Abuse" button. When the Report button is used, an alert is sent to the "Forum Monitor" group. ALL FMs will see an "FM Alert" notification at the top. Thereafter, they will...
  • Entry# 2095722
    Dec 18 2016 (11:34PM)


    Very soon, we shall have a points-system for Timeline updates, Atlas updates, News updates, Blog Tagging, News Tagging, Blog Tagging, etc. The reason for this is that some kinds of updates require more hard work and are more useful than others. Up-to-date News about late-running trains, updating TTs of trains only...
  • Entry# 2034010
    Oct 24 2016 (12:18AM)


    This is to address queries in the Forum about our various Groups - Admin, TL Monitor, FAQ Monitor, etc. . We are not appointing Admins anymore. Before Monitors, we had just one group called the Admin group. Now, we have the various Monitor groups. Our Admins themselves are members of the various Monitor...
Scroll to Top
Scroll to Bottom


Go to Mobile site