Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon May 1, 2017 02:06:04 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon May 1, 2017 02:06:04 IST

Blog Entry# 2023420  
Posted: Oct 14 2016 (18:12)

20 Responses
Last Response: Oct 15 2016 (01:27)
  
Rail News
0 Followers
3534 views
Other News
Oct 14 2016 (17:59)   Talgo train trial run illegal? Who gave the approval for the trial, CRS asks Railways
 

Jayashree ❖ Amita*^   36167 news posts
Entry# 2023420   News Entry# 283025         Tags   Past Edits
New Delhi: The Railways may have successfully conducted the Spanish-made Talgo train run trial which clocked just about 12 hours between Delhi-Mumbai route, however, it seems to have run into a controversy.
The Commissioner Railway Safety (CRS), which gives clearances on go-ahead of such trial runs, has asked the Railways as to who gave them the approval for the test.
Railways had conducted trials of Talgo on Delhi-Mumbai route successfully last month by clocking about 12 hours which was 4 hours less that Rajdhani travel time.
Advertisement:
...
more...
Replay Ad
And for such trial runs, the Railways is to get mandatory clearances from CRS before running new trains as per the standard procedure.
However, it appears that Railways had not sought CRS permission for the trial run of Talgo train.
"Since it was a trial run and there was no involvement of passengers in the entire operation, no permission was sought from CRS," said a senior railway ministry official, adding, "the trial was conducted with the Railway Board's approval".
"We have responded to the CRS about the whole issue stating the details of trial operation," the official said.
On whether CRS would be informed in future of such trials, he said a decision is yet to be taken on such issues.
The trial of Talgo coaches, shipped from Barcelona, was conducted with empty coaches as well as coaches filled with sand bags.
Railways aims to reduce travel time between the two metropolis by increasing train speed on the existing track. The light-weight Spanish coaches can easily negotiate on the curves as it takes less time to accelerate and decelerate on the existing track.
Since there are a large number of high-speed rail vendors in the market, the Railways is yet to decide on whether it will float tenders or get into a public partnership model with Talgo as a way forward.
 
With PTI Inputs

12 posts - Fri Oct 14, 2016

3 posts - Sat Oct 15, 2016

  
1134 views
Oct 15 2016 (00:35)
Boxer Bhai   38817 blog posts   12690 correct pred (61% accurate)
Re# 2023420-16            Tags   Past Edits
Duessra hoildays mattu lo padiuntaru

  
1177 views
Oct 15 2016 (00:50)
Proud atheist~   4238 blog posts   37 correct pred (63% accurate)
Re# 2023420-17            Tags   Past Edits
CRS reminds me of the famous dialogue"Aal is well" from the movie 3 idiots..Because in the movie all is well meant that u need to befool your heart sometimes to stop yourself from panicking ..The same goes with CRS..It doesn't mostly mean that if cRs test of a newly laid track or other stuffs like electrification etc is conducted then it will be totally fit for running of trains its only to befool our heart that a particular track is safe now..in shayari u can say that "dil ko behlane ko Galib ka ye khayal accha hai"

  
1149 views
Oct 15 2016 (01:05)
चली चली मेरी रेल चली~   1117 blog posts   82 correct pred (86% accurate)
Re# 2023420-18            Tags   Past Edits
Because CRS needs to be independent from Railways. Else RB can force them to sanctions ASAP and safety will go unchecked

  
1397 views
Oct 15 2016 (01:24)
Awes Khan*^~   42755 blog posts   2163 correct pred (78% accurate)
Re# 2023420-19            Tags   Past Edits
This is the best example of how this government is working.

  
1118 views
Oct 15 2016 (01:27)
IPL 2017 is boring^~   80769 blog posts   5100 correct pred (78% accurate)
Re# 2023420-20            Tags   Past Edits
no its not like that....many times constructed track are not fit so crs wont giv permission...look at case of jabalpur gauge coversion..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu May 11
Trains with ARP 15 Dep on: Tue May 16
Trains with ARP 30 Dep on: Wed May 31
Trains with ARP 120 Dep on: Tue Aug 29

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site