Posted: Oct 16 2016 (17:41)

4 Responses
Last Response: Oct 30 2016 (21:06)
  
★  General Travel
0 Followers
2650 views
Oct 16 2016 (17:41)   12851/Bilaspur-Chennai Central Weekly SF Express (PT)
 

akku   786 blog posts   633 correct pred (82% accurate)
Entry# 2025800            Tags   Past Edits
Electrification status of gondia ballarshah section
Pic taken at nagbhir,see the erected electric poles and lots of cement slabs for doubling.
Noticed that the poles are erected with wiring throughout the route

  
2194 views
Oct 17 2016 (08:58)
2017Year of hopes for JBP~   3141 blog posts   44 correct pred (50% accurate)
Re# 2025800-1            Tags   Past Edits
so hope before the opening of JBP-BTC-G route G-BPQ route will be fully electrified and may b doubled so this will also give hope for the fast electrification of JBP-BTC-G route also so that power change problems can be avoided

  
2198 views
Oct 17 2016 (09:01)
2017Year of hopes for JBP~   3141 blog posts   44 correct pred (50% accurate)
Re# 2025800-2            Tags   Past Edits
plz post more pics of G-BPQ ongoing electrification work if possible

  
2125 views
Oct 18 2016 (21:16)
akku   786 blog posts   633 correct pred (82% accurate)
Re# 2025800-3            Tags   Past Edits
not possible as of now
i actully had planned to make a detailed coverage out of that route but i was sooo tired that i coudnt even stand properly during that time.
this pic was actully taken from the inside of coach.
all i can say is that gondia bpq will see Eloco as early as 2017,bcoz all wiring has been completed except at
...
more...
the station patchs
also im not sure if there is any substation building up for the route.
if the line is charged,trains like krba tvc,bsp ers,bsp ten might run via this route
and wainganga and bsp mas exp will run with Eloco
also this route is profitable from feright prospective so i hope railway will charge this line soon

  
1838 views
Oct 30 2016 (21:06)
चली चली मेरी रेल चली~   986 blog posts   75 correct pred (84% accurate)
Re# 2025800-4            Tags   Past Edits
Glad to see the progress but feeling sad as I will greatly miss twin ALCO rampage of 12851/2.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...