Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 15:21:46 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 15:21:46 IST

Blog Entry# 2027002  
Posted: Oct 17 2016 (17:03)

18 Responses
Last Response: Oct 21 2016 (13:42)
  
★★  Rail News
0 Followers
3890 views
Oct 17 2016 (16:59)   CR mulls chord line to bypass Daund station
 

Rail Premi   27 news posts
Entry# 2027002   News Entry# 283276         Tags   Past Edits
Pune: The Central Railway (CR) plans to build a chord line on the Pune-Manmad route which will bypass Daund station and help speed up long distance trains travelling on this route.
Sources from the Pune railway division said that plans are underway to bypass Daund station in the future and schedule long distance trains directly through Pune-Manmad route.
At present, many long distance trains travelling from Pune to places like Delhi, Howrah, Chandigarh among others are plied through Daund and Manmad.
“From
...
more...
Pune, trains first travel up to Daund. From Daund, the trains have to change their direction to travel up to Manmad. For changing direction, the engine has to be attached to the train on the other side. The process of changing engines takes over 40 minutes of time which could be avoided,” said sources from the railway.
They added that at present, there are plans that instead of travelling to Daund and changing engines for travelling up to Manmad, a chord line can be constructed two to three kilometres before Daund station.
This will help bypass Daund station thus saving one to two hours, said the sources. Officials from the Pune railway division said that plans for having a chord line are already in place but it would take close to two to three years for the work to get completed.
President of Railway Pravasi Group Harsha Shah said that it will be a welcome move if in the future, Daund station can be bypassed and long distance trains can be routed directly on the Pune-Manmad route.
“Daund is a technical halt for all long distance trains and not a commercial halt. This halt is mainly for changing the engine. If this can be avoided, then, long distance trains will be able to save two hours which will be very beneficial,”
added Shah.

9 posts - Mon Oct 17, 2016

4 posts - Tue Oct 18, 2016

  
1019 views
Oct 18 2016 (12:20)
deepakyerr~   777 blog posts
Re# 2027002-14            Tags   Past Edits
120km of new line requires 1000-1200 cr and to complete in next 3 yrs requires 200 cr allocation in 2017-18 budget and should increase over the years. They are many lines all over the country which are surveyed premilinary works started Yeats back and still waiting for allocation and this line is surveyed in 2015-16 land acquisition has to be done and we can't expect it do be complete in next 3 yrs. The only alternative to cut some running time is to construct bypass at daund in 1yr on pirioity basis.

  
1609 views
Oct 18 2016 (12:24)
ssastronaut   366 blog posts   4 correct pred (44% accurate)
Re# 2027002-15            Tags   Past Edits
Finally Aurangabad-Chalisgaon new rly line on CR Map. Hope they complete the survey AFAP and sanction the funds. This line will provide direct shortcut from Aurangabad to Ahemdabad, Indore/Jaipur/Delhi (After MMR-INDB new line)....This line will also be direct shortcut from Telangana to Gujrat- West MP..

  
1015 views
Oct 18 2016 (14:29)
srinivasvasanthi   3626 blog posts   13 correct pred (50% accurate)
Re# 2027002-16            Tags   Past Edits
All the Technical halt stations have to be provided with commercial halts station for the benefit of the passengers.

  
837 views
Oct 18 2016 (14:50)
SCR Godavari Express~   2353 blog posts   11 correct pred (91% accurate)
Re# 2027002-17            Tags   Past Edits
You are right.. the abvoe proposal is for that only sir.. just a bypass line of length of 3 km before Daund and join to Manmad line... even for that they say 3 years...

  
1314 views
Oct 21 2016 (13:42)
Fortyville   85 blog posts
Re# 2027002-18            Tags   Past Edits
Tunnel work yet to start ! Solid followup from pravasi sangh, Industry people ,DMIC, MLA MP from Dhulia-Chalisgaon,Aurangabad required which is not there! But atleast continue to put on different forums.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

  • Cabinet nod likely for Metro on Outer Ring Road today  News Entry# 294598
    by: karbang  Today (15:18)


    BENGALURU: The 17-km Rs 4.2k-cr Silk Board-KR Puram line to come up on an elevated corridor
    Metro connectivity on the Outer Ring...
  • Kashmir’s first Selfie death; boy crushed by train at Nowgam - Kashmir Reader  News Entry# 294597
    by: Jayashree ❖ Amita*^  Today (15:18)


    Srinagar: A boy died after he was hit by train near Nowgam railway station when he was taking a Selfie on railway track, reports said. The boy who is reported to be around 14-years hails from Nawpora area of Srinagar and he was at a relative’s home in Nowgam. Reports quoting...
  • Shop, watch films at train stations  News Entry# 294596
    by: Jayashree ❖ Amita*^  Today (15:16)


    Five local railway stations in city will turn into ‘one-stop’ destination for commuters.
    --
    Mumbai:...
  • Nelamangala-Shravanabelagola stretch gets green signal  News Entry# 294595
    by: karbang  Today (15:12)


    BENGALURU: THE Commissioner of Rail Safety, Southern Circle, has given the authorisation for the running of trains on the new 111-km railway line between Nelamangala and Shravanabelagola. When commissioned in March, this will become the shortest railway route between Bengaluru and Mangaluru by covering the 368-km between the cities within 10.5...
  • மானாமதுரையில் 2 நிமிடம் மட்டுமே நிற்கும் சேது எக்ஸ்பிரஸ் ரயில் பயணிகள் சிரமம்  News Entry# 294594
    by: emailconnect2hari  Today (15:08)


    மானாமதுரை: மானாமதுரையில் சேது எக்ஸ்பிரஸ் ரயில் இரண்டு நிமிட நேரமே நிற்பதால் பயணிகள் சிரமம் அடைந்து வருகின்றனர்.மானாமதுரை புவியியல் ரீதியாக சிவகங்கை, ராமநாதபுரம், விருதுநகர் மாவட்டங்களுக்கு சமதூரத்தில் அமைந்திருந்ததால் பிரிட்டீஷ் ஆட்சி காலத்தில் ரயில் போக்குவரத்து மானாமதுரை வழியாக அமைக்கப்பட்டது.தென்மாவட்டத்தில் முக்கிய ஜங்ஷனாக இருந்த மானாமதுரையில் இருந்து மதுரை, திருச்சி, விருதுநகர், ராமேஸ்வரம், பட்டுக்கோட்டை மார்க்கமாக ஏராளமான பயணிகள் ரயில்கள், சரக்கு ரயில்கள் இயக்கப்பட்டன. அதன்பின் அகலப்பாதை பணிகளுக்காக மீட்டர்கேஜ் ரயில்கள்...

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site