Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jun 22, 2017 22:27:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jun 22, 2017 22:27:12 IST

Blog Entry# 2027014  
Posted: Oct 17 2016 (17:21)

3 Responses
Last Response: Oct 19 2016 (14:47)
  
Rail News
0 Followers
929 views
Commentary/Human InterestSR/Southern  -  
Oct 17 2016 (06:54)   Track electrification up to Mangaluru by Dec.
 

rdb*^   129973 news posts
Entry# 2027014   News Entry# 283229         Tags   Past Edits
Work up to theNetravathibridge hasalready been executed
The track-electrification work up to Mangaluru is progressing as per schedule and is likely to be completed by December end.
The electrified track up to Cheruvathur was commissioned a few months ago and now the Southern Railway is working overtime to complete electrification of the 85-km track up to Mangaluru, which is part of the 307-km Shoranur-Mangaluru stretch.
Leftover
...
more...
work
Railway sources told The Hindu that electrification up to the Netravathi bridge, near Mangaluru, had already been executed. The focus now was on the leftover work at the Mangaluru Central station yard and the nearby Mangaluru Junction, which was expected to be completed within schedule, they said. The Kerala State Electricity Board has commenced laying underground 110 kV electric lines so as to feed the traction sub-station at Cheruvathur and near Elathur in Kozhikode by December itself, while the works on the sub-station at Uppala could take two more months, they said.
Upon completion, the authorities would approach the
Office of the Chief Railway Safety Commissioner in Bengaluru for the formal commissioning of the line which would mark the completion of the mainline track electrification works in Kerala.
Once commissioned, Railways would use electric locomotives for 75 per cent of the freight and passenger traffic, thereby opening avenues to run additional services, including Mainline Electric Multiple Unit (MEMU), that would offer cheaper and swift travel for short-distance passengers. Besides, Railways are also planning to set up an electric loco shed in Mangaluru to carry out urgent mechanical works.
Commissioning of the electrified stretch will mark a major milestone in the Railways drive to reduce fuel expenses, ensure punctual rail services, and introducing new train services in the sector.
KSEB lays underground lines to feed traction sub-stations at Cheruvathur, Elathur
Electrified track up to Cheruvathur commissioned
Work up to Netravathi bridge has already been executed

  
777 views
Oct 17 2016 (17:21)
Rail Fanning~   2655 blog posts
Re# 2027014-1            Tags   Past Edits
Even in the existing stretch at least till calicut, there seems to be not much of difference in the time of trains despite electrification.
The benefit will only come if there is some speed up and running time reduction in this stretch and also introduction of MEMU services to benefit local passengers.

  
602 views
Oct 19 2016 (14:42)
For Better Managed Indian Railways~   1933 blog posts
Re# 2027014-2            Tags   Past Edits
Practically speed is dependent on the track conditions (esp. Max Permissible Speed & speed restrictions) and electrification has little impact on speed (except suburban trains). However Journalists never miss opportunity to report that the speed of trains shall appreciably increase after electrification.

  
727 views
Oct 19 2016 (14:47)
rooky1979   45 blog posts
Re# 2027014-3            Tags   Past Edits
Very true

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jul 2
Trains with ARP 15 Dep on: Fri Jul 7
Trains with ARP 30 Dep on: Sat Jul 22
Trains with ARP 120 Dep on: Fri Oct 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.