Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Apr 26, 2017 19:33:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Apr 26, 2017 19:33:49 IST

Blog Entry# 2027135  
Posted: Oct 17 2016 (18:37)

1 Responses
Last Response: Oct 17 2016 (18:37)
  
Rail News
0 Followers
469 views
SCR/South Central  -  IR Press Release 
Oct 17 2016 (17:23)   Shri Mallikarjun Kharge, Former Minister of Railways and Shri Ravindra Gupta, GM/SCR Review Progress of Tunnel works on Bidar - Gulbarga New Rail Line Project
 

Jayashree ❖ Amita*^   36145 news posts
Entry# 2027135   News Entry# 283282         Tags   Past Edits
Shri Ravindra Gupta, General Manager, South Central Railway along with Shri Mallikarjun Kharge, Hon’ble former Minister of Railways & Member of Parliament, Gulbarga reviewed the progress of the o­ngoing tunnel works at Margutti o­n the Bidar-Gulbarga New Railway Line Project today i.e., 16th October, 2016. Shri R.C. Boolchandani, Chief Administrative Officer (Construction) and Other Officials of SCR were also present.
Shri Ravindra Gupta briefed Shri Mallikarjun Kharge o­n the status of the works, including the extent of completion and also plans drawn up for completing the remaining works. Later, Shri Ravindra Gupta along with Shri Mallikarjun Kharge visited the tunnel site near Margutti at Bidar end and inspected the o­ngoing works. They also reviewed the o­ngoing Road Over Bridge works going o­n
...
more...
above the tunnel. Shri Mallikarjun Kharge advised that railway shall ensure safety of road commuters in executing the bridge works..
Later, interacting with media Shri Ravindra Gupta, said that all measures have been taken and accorded due priority for completion of the tunnel works which is part of the Bidar – Gulbarga new railway line as planned. Of the 1.67 kms of tunnel works, o­nly 80 meters of work is left to be finished, said the General Manager. He expressed confidence that the tunnel drilling works which are going at 2.5 metres per day will complete within the stipulated time. The General Manager elaborated that though there were difficulties due to soil condition in the execution of tunnel works, they were overcome with technical assistance from RITES and RDSO. He expressed optimism that the Bidar-Gulbarga new rail line will be completed by March 2017.

  
468 views
Oct 17 2016 (18:37)
gopalfirst   78 blog posts
Re# 2027135-1            Tags   Past Edits
sir, what happened about kadapa bangalore new railway line sir??please give progress report sir please?

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat May 6
Trains with ARP 15 Dep on: Thu May 11
Trains with ARP 30 Dep on: Fri May 26
Trains with ARP 120 Dep on: Thu Aug 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site