Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 19:52:01 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 19:52:01 IST

Blog Entry# 2029013  
Posted: Oct 19 2016 (13:00)

8 Responses
Last Response: Oct 20 2016 (19:55)
  
★★  General Travel
0 Followers
2323 views
Oct 19 2016 (13:00)   GR/Gulbarga (4 PFs)
 

Jay Maharashtra~   192 blog posts   13 correct pred (89% accurate)
Entry# 2029013            Tags   Past Edits
Coaching Complex Gulbarga Rly Stn...

2 posts - Wed Oct 19, 2016

1 posts - Thu Oct 20, 2016

  
Oct 20 2016 (09:30)
skumarvkulkarni~   1647 blog posts
Re# 2029013-4            Tags   Past Edits
only one train maintained at the moment i.e Gulbarga-Hyderabad Intercity... next should be Solapur-Mumbai 6 days a week... Solapur division should extend 11306 exp till gulbarga and can be maintained at Gulbarga pit line

  
1614 views
Oct 20 2016 (09:51)
Piyush S~   1561 blog posts   65 correct pred (72% accurate)
Re# 2029013-5            Tags   Past Edits
What is capacity of Pit Line @ Gulbarga?
11305/06 SUR CSTM Exp has RSA with SUR BJP Biweekly Exp which is not necessary at all.
It can be extended till GR/Wadi by increasing reserved coaches..

  
Oct 20 2016 (11:04)
skumarvkulkarni~   1647 blog posts
Re# 2029013-6            Tags   Past Edits
There is 1 Pit line at Gulbarga can maintain 24 coaches rake(Train). And this pit line can maintain 3 such rakes that means 3 trains can be started from Gulbarga with primary maintenance... Yes 11305/6 should be extended till Gulbarga and the solapur-bijapur exp can be made Gulbarga-solapur-bijapur exp also..

  
1317 views
Oct 20 2016 (15:33)
Foamer~   1230 blog posts
Re# 2029013-7            Tags   Past Edits
26 coaches capacity I believe.
-
If trains meant for GR are extended to SUR; then surely SUR trains can be extended to GR.

  
1423 views
Oct 20 2016 (19:55)
Piyush S~   1561 blog posts   65 correct pred (72% accurate)
Re# 2029013-8            Tags   Past Edits
They may extend after doubling..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site