Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 22:36:55 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 22:36:55 IST

Blog Entry# 2033207  
Posted: Oct 23 2016 (09:42)

8 Responses
Last Response: Nov 10 2016 (20:53)
  
Imaginary
0 Followers
1166 views
011
Oct 23 2016 (09:42)   IMG56500/♥♥Mettupalayam Madurai Passenger♥♥

Kings of IR 12622 and 12002~   84 img trains   19 popular
330 green flags   188 red flags   2 green per Train
Entry# 2033207            Tags   Past Edits
After Gauge Conversion of PTJ-POY This will be an very useful and essential one for daily Travellers. Will run as Fast passenger between DG and MDU

3 posts - Sun Oct 23, 2016

  
470 views
Oct 23 2016 (10:09)
Aditya Siddharth   8891 blog posts   9853 correct pred (85% accurate)
Re# 2033207-6            Tags   Past Edits
Flagged green. With two rakes, there can be no problem and extension can be considered.

  
493 views
Oct 23 2016 (10:12)
NEET JEE then what for arts*^~   13651 blog posts   2 correct pred (100% accurate)
Re# 2033207-7            Tags   Past Edits
if extended to TEN then automatically CAPE will demand so Better use SCT/RMM

  
653 views
Oct 23 2016 (10:14)
Kings of IR 12622 and 12002~   1038 blog posts   64 correct pred (65% accurate)
Re# 2033207-8            Tags   Past Edits
Tough Bro only with 2 rakes it is possible and i Terminated at MDU Bcoz of evening connectivity should be there between POY n CBE there are 1000 pax travlling on a daily basis

  
731 views
Oct 23 2016 (10:14)
Kings of IR 12622 and 12002~   1038 blog posts   64 correct pred (65% accurate)
Re# 2033207-9            Tags   Past Edits
Thanks bro

  
502 views
Nov 10 2016 (20:53)
Guest: 7fdd886a   show all posts
Re# 2033207-23            Tags   Past Edits

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site