Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 07:16:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 07:16:51 IST

Blog Entry# 2039328  
Posted: Oct 27 2016 (21:44)

18 Responses
Last Response: Oct 28 2016 (18:45)
  
★  General Travel
0 Followers
1878 views
Oct 27 2016 (21:44)   ALJN/Aligarh Junction (7 PFs)
 

🚅भारतीए रेल समर्थक🚅~   10563 blog posts   18164 correct pred (66% accurate)
Entry# 2039328            Tags   Past Edits
Status on ALJN PF increase work and new modifications in pf numbers of trains...
->A line which was terminal type near to pf3 has been removed and pf3/4 has been extended in both directions i.e. CNB and NDLS side.
->The main platform for CNB bound trains was PF2 but now it is PF3.
->The main platform for NDLS bound trains was PF3 but now
...
more...
it is PF4.
->EMU,MEMU,BE-ALJN PASS PF changed from PF4 to PF2.
->75kmph TSR has been issued on CNB line.
->100kmph PSR remains the same on NDLS line.
->Loop line for CNB bound is PF2 and Loop line for NDLS bound is PF5.
->Beside the line of PF4 there is a line for goods then PF5 and then PF6.
->PF7 work is in progress while PF5&6 are functional.
-------------------------------------------------- -------------------------------------------------- -------
Some spottings-
# Loco change for BE pass occured from PF3 line.
# Simultaneously two goods train departed towards NDLS.
# NCR track work car were placed at PF7.
# More lights have been placed on PF3&4 making it more feasible for passengers.
# LED lights on PF5&6.
# Smooth functioning of trains on both sides.

1 posts - Thu Oct 27, 2016

12 posts - Fri Oct 28, 2016

  
640 views
Oct 28 2016 (18:19)
🚅भारतीए रेल समर्थक🚅~   10563 blog posts   18164 correct pred (66% accurate)
Re# 2039328-14            Tags   Past Edits
yes bhai....i was also eager to give update on this as i was in jaipur these days....

  
585 views
Oct 28 2016 (18:19)
abhi8444   157 blog posts   9 correct pred (69% accurate)
Re# 2039328-15            Tags   Past Edits
Now Pf 3&4 of aljn is very dangerous for pax coz pf 3 is down main line and pf 4 is up main line both side and there is curve on pf4 passengers have to be very care full pax should use foot over bridge coz if they try to cross track of pf 4 and thru train will came and there life will be in danger

  
758 views
Oct 28 2016 (18:19)
🚅भारतीए रेल समर्थक🚅~   10563 blog posts   18164 correct pred (66% accurate)
Re# 2039328-16            Tags   Past Edits
Thanks bhai...

  
629 views
Oct 28 2016 (18:25)
abhi8444   157 blog posts   9 correct pred (69% accurate)
Re# 2039328-17            Tags   Past Edits
One more news working of 3rd line started from dar(dadri) home to intermediate starter now the bottle neck problem will solve and all train will save it 30min and no halt for those train who used to stop to passing other thru train and also time save for emu/memu if this work completed

  
591 views
Oct 28 2016 (18:45)
🚅भारतीए रेल समर्थक🚅~   10563 blog posts   18164 correct pred (66% accurate)
Re# 2039328-18            Tags   Past Edits
yes bhai totally agree with you...

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site