Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Apr 23, 2017 13:58:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Apr 23, 2017 13:58:59 IST

Blog Entry# 2045156  
Posted: Nov 02 2016 (11:13)

1 Responses
Last Response: Nov 02 2016 (11:13)
  
Rail News
0 Followers
372 views
Nov 02 2016 (11:02)   Right track: Metro II project gets coast mgmt body nod
 

❤ WAP7 ❤~   1071 news posts
Entry# 2045156   News Entry# 284570         Tags   Past Edits
The Metro line II (Dahisar-Charkop-BandraMankhurd corridor) has been recommended for coastal regulation zone (CRZ) clearance. The project is likely to cost Rs 17,396 crore.
The Maharashtra Coastal Zone Management Authority (MCZMA) approved the proposal subject to various conditions, including no reclamation of coastal water bodies and ensuring the free flow of tidal water. The entirely elevated corridor will go over the Dahisar river, Poisar river, Vanai river, Oshiwara ri ver, Mithi river and Vakola nullah. In all 237 piers, 25 metres apart have been proposed for the project. Of these, 18 piers spread over 450 sq m will be in CRZ I. The 219 piers in CRZ II are entirely on the median of roads. The corridor which connects north-south and east-west
...
more...
areas stretches 40 kms and is expected to ferry 21lakh passengers daily by 2031. According to the MMRDA, which is executing the project, the distance between Dahisar to Mankhurd will be covered in 80 minutes.
[Click To Enlarge]

  
1381 views
Nov 02 2016 (11:13)
For Better Managed Indian Railways~   1933 blog posts
Re# 2045156-1            Tags   Past Edits
Why the the metro projects being conceived/ implemented today often terminate at Mumbai Municipal Corporation limits i.e. Borivali/Dahisar?
Unlike in 80s and 90s, the further 3 KM northward stretch i.e. Mira Bhayandar and Bhayandar are equally developed and populated since more than a decade.
Such metro projects conceived and implemented today should ideally terminate at Bhayandar (if not Virar), the natural end of the island of Mumbai, to serve maximum populace of MMR.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed May 3
Trains with ARP 15 Dep on: Mon May 8
Trains with ARP 30 Dep on: Tue May 23
Trains with ARP 120 Dep on: Mon Aug 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site