Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Apr 23, 2017 13:59:06 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Apr 23, 2017 13:59:06 IST

Blog Entry# 2045651  
Posted: Nov 02 2016 (18:03)

No Responses Yet
  
General Travel
0 Followers
1181 views
Nov 02 2016 (18:03)   56579/K.S.R.Bengaluru City - Nelamangala Passenger (UnReserved) | NMGA/Nelamangala (2 PFs)
 

Maxing Out on Polls~   1699 blog posts
Entry# 2045651            Tags   Past Edits
Bengaluru - Hassan Line Progress.
-
Here are some pics from my little trip to Nelamangala, I had last been there in 2013, just wanted to check out the progress to see if the Nelamangala- Shravanabelagola line would be commissioned by Dec 2016 (as stated in papers).
-
Pic
...
more...
1 ---- 16024 Malgudi Express with UBL WDG4D near MWM.
Pic 2 ---- 56579, the train I was travelling in, snaking into YPR with KJM WDG3A twins.
Pic 3 ---- SWR's Railbus at YPR.
Pic 4 ---- 17316 hastening towards YPR with ED WAP4, I couldn't click the loco in time. But it seems it gets E-loco from ED-YPR. This can be updated.
Pic 5 ---- The first change I noticed from last time in 2013 - instead of token system, signal is installed at the 3rd line at SDVL.
Pic 6, 7 ---- Signals at NMGA outer on either side.
Pic 8, 9, 10, 11, 16 ---- The rock cutting and levelling being done for Goods platform, which will come besides PF 2. After levelling, track laying hasn't been done, work has just stopped.
Pic 12 ---- Tiles laying at different rooms of the station, going on.
Pic 13, 14 ---- Train Boards. One of them of different train.
Pic 15 ---- Towards Hassan.
Pic 17 ---- Station Board.
Pic 18, 19 ---- Locos reversing.
--
----
The following info I gathered :
1. The signalling and track switching (currently its being done manually) work will take atleast 3 months from the commencement date. But it has not started nor any info when it will start.
2. The rails between Kunigal and Hassan are going to be replaced by 60 Kgs rails, removing the current 52 Kgs rail. This is to make sure it bears Goods train load. But I couldn't understand this because, I have no knowledge of this issue. But that work too hasn't started. Nor any intimation when it will start.
3. The info has been passed that this line needs to be opened ASAP, but nothing concrete in terms of date.
4. At NMGA itself - repainting, new SBs, new toilets and PF flooring works are going to start, but no info when. Signalling and track switching will happen when they start the same at all stations.
----------
Conclusion: Dec 2016 nothing will start, hope for Dec 2017 maybe.
--
Thanks.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed May 3
Trains with ARP 15 Dep on: Mon May 8
Trains with ARP 30 Dep on: Tue May 23
Trains with ARP 120 Dep on: Mon Aug 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site