Blog Entry# 2046791  
Posted: Nov 03 2016 (16:11)

1 Responses
Last Response: Nov 03 2016 (16:11)
  
Rail News
0 Followers
277 views
Nov 03 2016 (10:04)   Freight corridor land cost increases 75%

❤ WAP7 ❤~   961 news posts
Entry# 2046791   News Entry# 284655         Tags   Past Edits
The dedicated railway freight corridor has finally managed to award all contracts for the Dadri-Mumbai link over 11years after the flagship infrastructure project was announced. But on the eastern front -that will connect Ludhiana with Dankuni in West Bengal -nearly 10% of the land, which is close to 450 hectare, is yet to be acquired even as funding has now been tied up.
For the Rs 81,450 crore project, land acquisition and clearances have been the biggest headache so far. The project needed around 11,600 hectare -6,000 hectare for the western and 4,587 hectare for the eastern stretch. While it was battling court cases and arbitration, a third blow came by the way of the new land acquisition cost, which pushed up
...
more...
the average price from around Rs 1.3 crore a hectare to around Rs 2 crore -an increase of around 54%. Project cost has also been increased as the land acquisition cost rose 75% from the budgeted level of around Rs 8,000 crore to nearly Rs 14,000 crore now . This could go up further depending of the arbitration awards.
In recent years, land acquisition has been a major headache for most infrastructure projects -highways, railways, power generation and special economic zones (SEZs). In several cases, the projects needed to be reworked, if not shelved.
The corridors running across 3,360 km are aimed at building electrified railway system to enable each train to carry a load of up to 13,000 tonnes -which is the load carried by 1,300 trucks. On each corridor, Dedicated Freight Corridor Corporation of India (DFCCIL) is laying double lines, which will treble the average speed of the double-stack goods trains from 25 kmhour to 75 kmhour.While the western leg is funded by Japanese agency JICA, eastern stretch is financed by the World Bank.
“There is no escalation in the project cost. Whatever increase is there is on account of higher cost of land,“ said DFCCIL managing director Adesh Sharma, adding that the project would be fully ready by 2019-end, a year behind the original deadline.
But, before that it needs to battle nearly 2,000 court cases and over 9,500 arbitration awards, of which nearly half are yet to be disposed off. DFCCIL planned the project in a way that it avoided large cities, where land acquisition was going to be a problem. But, challenges have come mainly from areas around the large cities, where prices are higher and “fertile“ agricultural land is being acquired.
Sample this: Nearly half the arbitration cases that are pending are in Haryana (2,277 out of 4,679 cases). When it comes to court cases, Uttar Pradesh tops the list with 669 out of the 1,020 pending cases.
“Most of the arbitration cases relate to compensation based on the latest registration price. Wherever, there is an award, we are paying higher compensation,“ Sharma said.

  
656 views
Nov 03 2016 (16:11)
For Better Managed Indian Railways~   1933 blog posts
Re# 2046791-1            Tags   Past Edits
Earlier, the govt. land rates were a fraction of market rates. During boom of late 90d ans 00s, a large number of land dealings and registration gave tremendous revenues to state govts. In an effort to maximise this revenue, official rates of land has been jacked up by the State Govts to such an extent that they are higher than the actual market price. As a result the number of land dealings have drastically reduced and so is the revenue to the state govts. (Similar case to to Flexi-fare scheme). To day nobody want to buy and register and land in pockets where official price is much higher than market price, unless absolutely essential.
As a result the new infrastructure projects are
...
more...
becoming prohibitively costly and at the same time delayed in litigation thereby again increasing the interest during construction. The elevated pathway above the existing hoghways/ expressways is becoming more and more better option with passage of time.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 8
Trains with ARP 15 Dep on: Thu Apr 13
Trains with ARP 30 Dep on: Fri Apr 28
Trains with ARP 120 Dep on: Thu Jul 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site