Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jun 28, 2017 02:44:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jun 28, 2017 02:44:59 IST

Blog Entry# 2047234  
Posted: Nov 03 2016 (21:53)

5 Responses
Last Response: Nov 04 2016 (07:06)
  
Rail News
0 Followers
1307 views
New Facilities/TechnologyNR/Northern  -  
Nov 03 2016 (20:57)   विद्युतीकरण की रफ्तार को 2019-20 तक 6200 किलोमीटर वार्षिक पर लाया जाएगा

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   5913 news posts
Entry# 2047234   News Entry# 284733         Tags   Past Edits
जागरण ब्यूरो, नई दिल्ली : पर्यावरण सुधार के लिए बड़ा निर्णय लेते हुए रेलवे ने अगले तीन साल में विद्युतीकरण की रफ्तार को चार गुना तक बढ़ाने का निर्णय लिया है। इसके लिए सार्वजनिक उपक्रमों की मदद ली जाएगी। कार्बन उत्सर्जन घटाने के लिए सौर व पवन ऊर्जा का उत्पादन भी बढ़ाया जाएगा। गुरुवार को राजधानी में एक कार्यशाला के जरिए विशेषज्ञों के साथ इस पर भी चर्चा होगी।1रेलवे के मेंबर-ट्रैक्शन अश्वनी कुमार कपूर ने संवाददाताओं को रेलवे को कार्बन मुक्त बनाने की रणनीति बताई। इसके मुताबिक विद्युतीकरण की रफ्तार को 2019-20 तक 6200 किलोमीटर वार्षिक पर लाया जाएगा। यह प्रक्रिया पिछले साल ही शुरू हो गई थी, जब पहली बार 1730 किलोमीटर रेल लाइनों को विद्युतीकृत किया गया। इससे पहले अधिकतम 800 किलोमीटर विद्युतीकरण हुआ था। इसे मिलाने के बाद भी फिलहाल केवल 28 हजार किलोमीटर (42 फीसद) लाइनें ही विद्युतीकृत हैं। तकरीबन दो तिहाई मालगाड़ियां और आधी यात्री ट्रेने...
more...
बिजली से चलती हैं। बाकी पर डीज़ल गाड़ियों का संचालन होता है। इसे बदला जाएगा और विद्युतीकरण की रफ्तार को बढ़ाकर 2015-17 में 2000 किमी, 2017-18 में 4000 किमी, 2018-19 में 6000 किमी और 2019-20 में 6200 किमी वार्षिक तक पहुंचाया जाएगा। इस प्रक्रिया में इरकॉन, राइट्स जैसे रेलवे तथा पावरग्रिड जैसे विद्युत उपक्रमों को भागीदार बनाने का प्रस्ताव है। इससे रेलवे के ईंधन खर्च में सालाना 10 हजार करोड़ रुपये तक की कमी आने की संभावना है। नवीकरणीय ऊर्जा का भी यथासंभव उपयोग किया जाएगा। इसके लिए सौर व पवन ऊर्जा के कैप्टिव उत्पादन में बढ़ोतरी का प्रस्ताव है। वर्ष 2015-16 के रेल बजट में 1000 मेगावाट सौर ऊर्जा तथा 500 मेगावाट पवन ऊर्जा के उत्पादन का लक्ष्य रखा गया है। इसमें 500 मेगावाट सौर बिजली इमारतों की छतों पर, जबकि 500 मेगावाट बिजली जमीन पर सोलर पैनल लगाकर पैदा की जाएगी। 1 ज्यादा इलेक्टिक ट्रेने चलाने के लिए जाहिर है ज्यादा इलेक्टिक इंजनों की जरूरत पड़ेगी। लिहाजा मधेपुरा (बिहार) में एल्स्टॉम इंडिया के साथ लग रहे संयुक्त उद्यम कारखाने में 12 हजार हार्सपावर के ऊर्जा कुशल इलेक्टिक इंजनों का निर्माण होगा। इसके अलावा चितरंजन लोकोमोटिव कारखाने (सीएलडब्लू) में भी ज्यादा व ईंधन कुशल इंजन बनाए जाएंगे। और तो और डीज़ल लोकोमोटिव वर्क्‍स (डीएलडब्लू), वाराणसी में भी कुछ इलेक्टिक लोको बनाए जाएंगे। इस साल यहां दो इलेक्टिक लोको बनाए जा रहे हैं। जबकि अगले साल दस बनाने का प्रस्ताव है। अभी तक इलेक्टिक ट्रेनों में एसी, पंखे चलाने व लाइट जलाने के लिए डीज़ल चालित पावर कार लगानी पड़ती थी। लेकिन अब इनका संचालन भी ओवरहेड विद्युत लाइन (ओएचई) की बिजली से होगा। इसकी तकनीकी ईजाद कर ली गई है। सभी नई ईएमयू (इलेक्टिक मल्टिपल यूनिट्स) में अब ऊर्जा कुशल रेक का इस्तेमाल होगा।

  
1244 views
Nov 03 2016 (21:53)
Aditya Immortal ™ ©~   3109 blog posts   186 correct pred (54% accurate)
Re# 2047234-1            Tags   Past Edits
News to aache hai but jo Madepura me Alstom ke factory establish hone me kam se kam 5 year lagange and production hone me 6-7 years ....

  
1198 views
Nov 03 2016 (21:57)
Tubeligjt to 4 din bhi nahi chali^~   82820 blog posts   5299 correct pred (78% accurate)
Re# 2047234-2            Tags   Past Edits
yaani agle 4 saal me poora IR electrify .. phir ye diesel loco kaha jayenge .. haha..

  
837 views
Nov 03 2016 (23:53)
For Better Managed Indian Railways~   1933 blog posts
Re# 2047234-3            Tags   Past Edits
Following may happen to Diesel locos after majority of BG is electrified:
(1) We shall be seeing some diesel locos operating for several years in electrified IR network as we see today.
(2) Some diesel engines still have to be maintained by IR for use in emergency, power/OHE failure, accident etc
(3)Diesel engines can be sold/leased out to neighbouring countries which are having BG
...
more...
network
(4) some of the isolated branch lines which are not a part of long route may not be electrified and continue with diesel traction.
(5) IR may try to retrofit the diesel locos with e-loco eqpt

  
880 views
Nov 03 2016 (23:58)
Indian Railways the life line of our Nation~   16046 blog posts   137 correct pred (82% accurate)
Re# 2047234-4            Tags   Past Edits
Diesel locos Frieghts,Passengers and some Express trains ko haul karenge

  
1700 views
Nov 04 2016 (07:06)
12952 GKP Trip 28 June BSK~   6769 blog posts   343 correct pred (77% accurate)
Re# 2047234-5            Tags   Past Edits
Sir itni jaldi electifiacation nhi hone wala ye sirf jumle h.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jul 8
Trains with ARP 15 Dep on: Thu Jul 13
Trains with ARP 30 Dep on: Fri Jul 28
Trains with ARP 120 Dep on: Thu Oct 26

  
  

Rail News

  • GST most significant reform since Independence: Railway Minister Suresh Prabhu  News Entry# 306710
    by: rdb*^  Yesterday (22:37)


    CHENNAI: GST is the single largest and most significant reform post-Independence and is a great positive step in the right direction, Union Minister of Railways Suresh Prabhu said here on Saturday. The Union Minister was in the city to attend the 100th GST seminar organised by the Southern India Regional Council...
  • Anticipating crowds, Metro arranges rides every 7 mins  News Entry# 306709
    by: rdb*^  Yesterday (22:36)


    KOCHI: Anticipating large crowds this weekend, Kochi Metro Rail Ltd (KMRL) will operate services every seven minutes. The Metro agency said that services would begin at 8am on Sunday instead of 6am. By 7pm on Saturday, the Metro agency's collection rose to Rs 18.73 lakh, while the ridership for the day...
  • Kochi Metro: They have jobs but no place to stay  News Entry# 306708
    by: rdb*^  Yesterday (22:34)


    KOCHI: Kochi Metro's landmark decision to employ transgender persons may have garnered international attention, but closer home social stigma continues to determine matters. Nine of the 21 transgender persons who were given jobs by Kochi Metro Rail Ltd (KMRL) in the ticketing and housekeeping departments have not reported for duty since...
  • Driverless metro trains to start operations from October  News Entry# 306707
    by: rdb*^  Yesterday (22:33)


    HIGHLIGHTS This line is planned to be opened in stages between October 2017 and March 2018 As the corridor will witness the first operations of driverless trains, DMRC is not taking any chances and rigorous trials are being carried out File photo of driverless metro train getting ready at Mukundpur depot...
  • Metro rail tunnels to north Chennai by year-end  News Entry# 306706
    by: rdb*^  Yesterday (22:31)


    CHENNAI: Before the end of 2017, a part of north Chennai will be connected through metro rail tunnels. Work to build tunnels for a 1km stretch between Washermenpet and Korukkupet is on at full swing. Chennain Metro Rail Ltd (CMRL) officials said they will complete the construction of the tunnels in...

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.