Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Mar 29, 2017 22:55:13 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Mar 29, 2017 22:55:13 IST

Blog Entry# 2047250  
Posted: Nov 03 2016 (22:11)

2 Responses
Last Response: Nov 04 2016 (00:05)
  
Rail News
0 Followers
538 views
Other News
Nov 03 2016 (18:59)   PowerGrid to electrify 761-km rail track at Rs 889 cr - Moneycontrol.com

Jayashree ❖ Amita*^   35885 news posts
Entry# 2047250   News Entry# 284726         Tags   Past Edits
PowerGrid to electrify 761-km rail track at Rs 889 cr "The Ministry of Railways has allotted 761 kms of railway route electrification work at cost of Rs 888.96 crore to Power Grid Corp (PGCIL)," a senior official told PTI.
Power Grid Corporation will electrify 761 km of rail lines in the country at a cost of Rs 888.96 crore as part of Indian Railways' plan to energise 24,000 km track in the next five years. "The Ministry of Railways has allotted 761 kms of railway route electrification work at cost of Rs 888.96 crore to Power Grid Corp (PGCIL)," a senior official told PTI. The letter of allotment was handed over to the power ministry Joint Secretary (transmission) Jyoti Arora and PGCIL
...
more...
Director Ravi P Singh by Railway Minister Suresh Prabhu during the international conference on Decarbonization of India Railways Mission Electrification held in the capital, the official said.
Among the four stretches to be electrified by PGCIL are Pune-Miraj-Kolhapur 326 km at a cost of Rs 513.07 crore, Chhindwara-Nainpur-Mandla Fort 183 km at Rs 90.71 crore, Londa-Miraj 189 km at Rs 208.15 crore and Mansi-Sahrsa-Dauram Madhepura 63 km at Rs 77.03 crore. The electrification project will help the government cut down crude import and also ensure faster movement of trains on these tracks. At present, around 35,000 km of rail track remains unelectrified. The electrification of tracks is expected to help the Railways save around Rs 10,000 crore annually. Indian Railways consumes around 2.8 billion litres of diesel annually, at a cost of around Rs 18,000 crore -- nearly 18 per cent of its working expenses. Earlier this year, Power Minister Piyush Goyal had talked about the government's plans to rope in PGCIL for meeting the tall order of electrifying 35,000 km of tracks. Goyal had also said PGCIL would do a pilot of 1,000 km to assess its capability. Indian Railways has planned to electrify 24,000 km of rail track in the next five years to reduce dependence of fossil fuel. According to the minister, the electrification of entire rail tracks in the country will lead to power consumption going up by 7 billion units.

  
554 views
Nov 03 2016 (22:11)
Mazi IRI   664 blog posts
Re# 2047250-1            Tags   Past Edits
only 761 km...!!!

  
1132 views
Nov 04 2016 (00:05)
For Better Managed Indian Railways~   1933 blog posts
Re# 2047250-2            Tags   Past Edits
Baatein jyada kaam kum.
If 24000 RKMS are to be electrified in 5 years, then the role of taking pilot project taken by PGCIL does not have much significance because, after 5 yrs not much tracks (about 9000 KMS only) shall be left for electrification.
Chhindwara-Nainpur-Mandla is presently NG and still under conversion, prioritization of this route is surprising.
Handing over of letter
...
more...
of allotment already done- clearances are really coming at lightening speed in IR, a very welcome change.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Apr 8
Trains with ARP 15 Dep on: Thu Apr 13
Trains with ARP 30 Dep on: Fri Apr 28
Trains with ARP 120 Dep on: Thu Jul 27

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site