Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Feb 22, 2017 00:48:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Feb 22, 2017 00:48:12 IST

Blog Entry# 2047257  
Posted: Nov 03 2016 (22:16)

2 Responses
Last Response: Nov 03 2016 (23:43)
  
Rail News
0 Followers
447 views
Commentary/Human Interest
Nov 03 2016 (22:15)   Minister of Railways inaugurates International Conference on Decarbonisation of Indian Railways - Mission Electrification

rdb*^   125949 news posts
Entry# 2047257   News Entry# 284738         Tags   Past Edits
Minister of Railways Shri Suresh Prabhakar Prabhu has inaugurated the International Conference on Decarbonisation of Indian Railways - Mission Electrification organised by Institution of Railways Electrical Engineer (IREE) in partnership with ASSOCHAM India. Chairman, Railway Board, Shri A. K. Mital, Member Traction, Railway Board Shri Ashwani Kumar Kapoor, other Railway Board Members and senior officials were also be present on the occasion.
On the occasion a mobile app ‘RAIL SAVER’ was launched by the Minister of Railways Shri Suresh Prabhakar Prabhu. This app is expected to reduce energy consumption by 15 – 20%.
Speaking
...
more...
on the occasion Shri Suresh Prabhakar Prabhu said that Indian Railways is looking forward to make Railways greener by electrifying another 24000 km of Rail Tracks to the existing 28000 km in the next few years. He also said that being the biggest user of energy Indian Railways consumes about 18 billion units of electricity and about 2.4 billion liters of fuel oil which is more than 2% of country’s energy consumption. Energy demand of Indian Railways is expected to triple by 2030 from current levels to 49 billion units of electricity. Decarbonising the Railways will help achieve the commitment made by India under Paris agreement to reduce its Green House Gas emissions by 33-35% by 2030 from the 2005 levels. He further said that Railways will change significantly with the initiatives to produce greener energy & by electrifying the railways substantially. Consumption of imported oil will come down with electrification, thereby reducing burden on the exchequer. He also said that Increase in the pace of electrification will reduce its fuel bill by Rs. 10000 Crore annually as against the business as usual approach.
Addressing the conference Shri AK Mital, Chairman Railway Board said that by adding 24000 km under Mission Electrification about 90% of the tracks under Indian Railways will become electrified. Electricity consumption will be reduced under Mission Electrification through the adoption of energy efficient appliances/equipment. He also said that Indian Railways has set a target of 40% of cumulative electricity generation capacity through renewable energy by 2030.
Shri Ashwani Kumar Kapoor, Member Traction, Railway Board said that Indian Railways has embarked upon Mission Decarbonisation and Mission Electrification with an aim to reduce dependence on imported fuel and rationalize the cost of energy for Railways.

BACKGROUNDER ABOUT INTERNATIONAL CONFERENCE ON DECARBONIZATION OF INDIAN RAILWAYS - MISSION ELECTRIFICATION:
· The Conference aims at bringing various stakeholders on a common platform for exchange of ideas and to deliberate on implementable technological solutions and financing options to significantly increase pace of electrification and achieve the target for setting up of renewable energy installations with total capacity of 1000 MW by 2020.
· The Conference also projected Indian Railways as an attractive investment destination considering its plans for huge investment in next 5 years towards modernization of its electrified network and use of renewable energy.
· The Conference shall cover aspects relating to policy, technological modernization, mechanization, innovations and financing models for railway electrification and de-carbonization.
· National Transport Development Policy Committee (NTDPC), in its report, has identified electrification of railway tracks as a means to reduce fuel consumption. The report has recommended for taking up electrification on priority through systematically tackling the bottlenecks in progress of electrification projects. It has also suggested that electrification should be viewed as a means of making rail transport independent of imported fossil energy, while also provide a choice in sourcing energy. Moreover, electric traction allows regeneration of power while braking/coasting and feeding the network, thereby reducing overall consumption of energy and carbon emissions.
· In this regard, following action has been planned for improving efficiency and bringing in cost economies in freight and passenger operations. Reducing the Carbon Foot prints through use of sustainable and green sources of energy is also a key focus area.
In line with this vision, following action plan has been planned:

· Electrification of Railway Tracks
Currently 28,000 Rkm of tracks are electrified (42% of the total network) carrying around two-thirds of total freight traffic and 50% of total passenger traffic. As against 800 km of average electrification in the earlier years, 1600 Rkm of railway tracks were electrified in 2015-’16.
Further, in order to enhance the pace of electrification, following plan has been prepared:
Year
2016-’17
2017-’18
2018-’19
2019-’20
2020-’21
Target for electrification (Rkm)
2,000
4,000
6,000
6,200
6,200

To fast track the pace of electrification, Ministry of Railway would be involving PSUs like IRCON, RITES and PGCIL. Increase in the pace of electrification will reduce its fuel bill by Rs. 10,000 cr. annually as against the business as usual approach.
· Harnessing Renewable Energy on IR to reduce energy cost and carbon footprints
- Indian Railways targets to harness 1 GW solar and 500 MW wind power as announced in Rail Budget 2015-’16,
- 500 MW of solar units on roof tops through Central Finance Assistance (CFA) from MNRE and balance 500 MW on land.
· Introduction of Energy Efficient Rolling Stock
Acquisition/ Introduction of new energy efficient Rolling Stock has been initiated through the following projects
· Electric Loco Manufacturing Factory at Madhepura in Bihar
Project awarded to Madhepura Electric Locomotive Private Limited (MELPL), a JV company of Ministry of Railways and Alstom Manufacturing India Limited, to manufacture, supply and maintain the state of art 12,000 HP energy efficient locomotives.
· Production of Energy Efficient High Horsepower Locomotives
- Last year, CLW achieved highest ever out turn of 280 locomotives, out of which 215 were energy efficient three-phase electric locomotives.
- CLW has completely switched over to production of only energy efficient IGBT based High Horse Power three-phase locomotives from current year and has turned out 122 such locos till Sept.’16.
· Head On Generation (HOG)
Indian Railways have introduced HOG system wherein the lighting, air-conditioning and other electrical loads of passenger coaches would be fed directly from electric power drawn by locomotive from grid. This system will do away with the requirement of diesel power car for feeding electric supply to coaches and also enable in carrying additional passengers. This system has already been introduced in NDLS-Mumbai Rajdhani Express saving around 3,000 liters of diesel in one round trip.
· Electrical Multiple Units (EMUs)
All new EMUs produced will be energy efficient with three phase technology having regeneration capability. Around 200 energy efficient rakes have been introduced in Mumbai Suburban area having regenerative braking feature since 2007.
· Manufacturing of energy efficient electric locos from DLW, Varanasi
In order to meet the increased requirement of electric locomotives resulting from accelerated electrification, it has been decided to manufacture electric locos from DLW, Varanasi also. It is planned to manufacture two locos in the current financial year followed by ten locos next year and there on.
****
AKS/MKV/AK


(Release ID :153230)

  
1489 views
Nov 03 2016 (22:16)
rdb*^   30527 blog posts   359260 correct pred (79% accurate)
Re# 2047257-1            Tags   Past Edits
In order to meet the increased requirement of electric locomotives resulting from accelerated electrification, it has been decided to manufacture electric locos from DLW, Varanasi also. It is planned to manufacture two locos in the current financial year followed by ten locos next year and there on.

  
Nov 03 2016 (23:43)
For Better Managed Indian Railways~   1933 blog posts
Re# 2047257-2            Tags   Past Edits
Switch over plan of DLW from diesel loco to electric loco, give us an enough reason that we can finally see IR as a fully electrified network in years to come. (except-heritage, hill railways)

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Mar 4
Trains with ARP 15 Dep on: Thu Mar 9
Trains with ARP 30 Dep on: Fri Mar 24
Trains with ARP 120 Dep on: Thu Jun 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site