Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 12:03:44 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 12:03:44 IST

Blog Entry# 2047760  
Posted: Nov 04 2016 (12:41)

3 Responses
Last Response: Nov 04 2016 (18:25)
  
Rail News
0 Followers
900 views
Other News
Nov 04 2016 (12:16)   Railway targets electrification of 24,000 km track in five years

Jayashree ❖ Amita*^   35461 news posts
Entry# 2047760   News Entry# 284783         Tags   Past Edits
Electrification of majority of routes will help railways in reducing the energy bill, says Suresh Prabhu
Setting an ambitious target of electrification of 24,000 km long track in the next five years, Railway Minister Suresh Prabhu on Thursday said it will help in running trains in a faster and cleaner manner.
Besides, electrification of majority of routes will help railways in reducing the energy bill considerably, he said.
"Railways'
...
more...
expenditure on energy is the second highest after salary and pension bill. Expansion of electrified routes across the country will also help in reducing the energy bill as we have committed to reduce the energy cost," he said at global seminar on Mission Electrification and Decarbonisation of Indian Railways here.
Describing the event as an "important milestone", Prabhu said, "When railways started its operation it used horses to pull the train. Now we are using horsepower to move trains at faster pace. So it is back to roots."
Currently about 2000 km track is being electrified in a year and the aim is to reach 4,000 km per year by 2017-18 and 6,000 km in subsequent year.
Talking about mission electrification, Prabhu said, "The target is electrification of about 24,000 km in the next five years and the electrification will also reduce the energy bill. We have tied up with three PSUs to increase the pace of route electrification. With the expansion of electrification of majority of rail network, railways will run trains in a faster and cleaner manner."
In order too fast track the pace of electrification Railways have joined hands with three PSUs - IRCON, RITES and PGCIL.
He also asked the three PSUs to compete with each other to complete the electrification work in faster way.
Railways expect to reduce fuel bill by Rs 10,000 cr annually through electrification of major routes.
Expressing concern over the ever-increasing pollution, he said, "Carbon emission is a major challenge in India and also in the world. We have reached level where carbon cannot be absorbed. We have to reduce the greenhouse gas significantly to prevent ill-effect of pollution on human lives."
He said using clean energy including solar and wind power is key to reduce the emission level.
"Through electrification trains speed will go up. We have framed a time frame. Three PSUs have been roped in to do the electrification. It is very important for the environment point of view."
Prabhu also highlighted railway's partnership with various ministries including power, science and technology, environment to achieve its goal.
A new App for monitoring energy conservation scheme was also launched at the event.

  
1848 views
Nov 04 2016 (12:41)
Mangalagiri   335 blog posts
Re# 2047760-1            Tags   Past Edits
More Promises .. Less Deliverables.

  
1918 views
Nov 04 2016 (12:50)
rooky1979   34 blog posts
Re# 2047760-2            Tags   Past Edits
Bitter truth

  
1134 views
Nov 04 2016 (18:25)
srinivasvasanthi   3620 blog posts   13 correct pred (50% accurate)
Re# 2047760-3            Tags   Past Edits
Congrats to our RM Honorable SURESJI for this massive Electrification of most of the Railway lines in our India.It saves energy and add carbon foot print up-gradation and environmentally friendly move.The line capacities are also increased around 20% and so RM has to introduce additional train services in all the patronages routes with 24 ICF /22 LHB Coaches trains.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site