Blog Entry# 2048738  
Posted: Nov 05 2016 (08:45)

9 Responses
Last Response: Nov 07 2016 (09:49)
  
Rail News
0 Followers
2590 views
New Facilities/TechnologySWR/South Western  -  
Nov 05 2016 (08:41)   Third entrance to City railway station to be ready by December

karbang~   162 news posts
Entry# 2048738   News Entry# 284833         Tags   Past Edits
The South Western Railway (SWR) has taken up the work of constructing the third entrance for the Krantiveera Sangolli Rayanna (KSR) City Railway Station in Majestic.
The entrance, which is coming up right opposite the Kempegowda interchange metro station, will have a separate ticket counter and parking facilities.
Rs 1.5 crore budget
Sanjiv Agarwal, Divisional Railway Manager (DRM), SWR, told DH that a third
...
more...
entrance was necessary as the other two entrances saw huge rush during peak hours.
“We have already started the work, which is estimated to cost around Rs 1.5 crore. The entrance as well as the ticket counter will be thrown open for public use by December,” he said. SWR also plans to outsource the maintenance of the parking lot.
The main as well as the second entrance of the station are congested and unkept.
Krishna Prasad, retired central government employee and regular traveller, was happy with the news of the third entrance. “It will be of much help for people, especially those from south Bengaluru. The two existing entrances are surrounded by hawkers and autorickshaws, with little space for pedestrian movement. Through the new entrance, people can directly get to platform-1,” he said.
Foot overbridge
At the moment, Metro commuters have to take the dirty subway from the railway station side or risk their life crossing the road at the two ends. Although Bangalore Metro Rail Corporation Limited (BMRCL) has proposed to construct a foot overbridge, there has been little progress.
Agarwal promised to provide space to erect the foot overbridge at the third entrance.
“We do not have funds to take up the work on our own. If BMRCL is ready to undertake the work, we will provide space,” he said. BMRCL managing director Pradeep Singh Kharola, on his part, said he would take up the matter with the SWR shortly.

3 posts - Sat Nov 05, 2016

1 posts - Sun Nov 06, 2016

  
960 views
Nov 06 2016 (15:43)
Tabbys star and the Alien outpost~   2545 blog posts
Re# 2048738-5            Tags   Past Edits
Linking the two routes at SBC station is now an almost impossible task. With the current platform locations, there isn't enough space to construct a track connecting the two as the required alignment for connecting 8-10 to the MAS side passes through the industrial establishment outside SBC station. Connecting the YPR route to PF 1-7 is even more difficult currently due to the rather sharp curve taken by the MAS route right before SBC.
For connecting both routes at SBC station, PF's 8-10 will have to be moved southwards by almost a third of their length, which is a cumbersome task that SWR will surely never take up. Joining both routes at SBC could have been possible
...
more...
only at the time YPR route was being converted to BG. Now, it's too late to solve that issue.

  
1615 views
Nov 07 2016 (09:08)
irifan2015   520 blog posts
Re# 2048738-6            Tags   Past Edits
Even now, PF 6/7 can be linked to MWM line with minor realignments and modifications. If SWR wants to do, they will be able to do. Else, only reasons for not doing will be put up.

  
1615 views
Nov 07 2016 (09:21)
Tabbys star and the Alien outpost~   2545 blog posts
Re# 2048738-7            Tags   Past Edits
Possible, yes. but not exactly minor modifications. With the current layout of the buildings around the station and the the rather sharp deviation between the MAS line and YPR line after the station, there isn't enough space to accommodate the curve required to connect both routes.
PF's 6,7 can be connected to YPR line if the entrance building between PF's 7 and 8 is demolished and the north end of PF 7/8 suitably re-aligned. But the opposite ( MAS line to PF's 8-10) isn't possible without a complete re-planning of the western part of the station. Even if the entrance between PF's 7 and 8 is demolished and land freed up for the railway, the
...
more...
MAS line just curves out too rapidly and will require PF's 8-10 and some part of the yard to be shifted to the south by a good distance. A bit too much to expect, even from a well-functioning zone (unlike SWR).
Let's hope SWR will at least utilize the Binny mills land properly and connect the MYS route to PF's 1-4.

  
1588 views
Nov 07 2016 (09:39)
irifan2015   520 blog posts
Re# 2048738-8            Tags   Past Edits
SWR to decide positively on linking 2 lines. Ticket counter can be shifted to nearer the main road. Parking space can be on MWM line side.
Such a link can be used for running trains via SBC (Say LTT-CBE, MAS-UBL, DR-TEN/PDY even 5 days a week NCJ/TVC -CSTM). These trains can come via BNC and go via YPR. Will be helpful to lots of people. Even one can think of MAS-MAQor CBE/SA-SMET via SBC.

  
1649 views
Nov 07 2016 (09:49)
▶కాటమరాయుడు collects more than 45cr on 1st day◀*^~   15703 blog posts   4386 correct pred (85% accurate)
Re# 2048738-9            Tags   Past Edits
Finally!!!!!!!!!!!!!!!!!!!!!!!!!

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jun 4
Trains with ARP 15 Dep on: Fri Jun 9
Trains with ARP 30 Dep on: Sat Jun 24
Trains with ARP 120 Dep on: Fri Sep 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...