Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Feb 20, 2017 09:43:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Feb 20, 2017 09:43:43 IST

Blog Entry# 2050965  
Posted: Nov 06 2016 (22:41)

11 Responses
Last Response: Nov 13 2016 (23:20)
  
General Travel
0 Followers
1887 views
Nov 06 2016 (22:41)   NZB/Nizamabad Junction (3 PFs)

Foamer~   1194 blog posts
Entry# 2050965            Tags   Past Edits
The atlas shows that NZB-LPJL section as completed.
Is it so? If it is, when will trains start plying on that section?
It was slated to start in Nov 2016, I believe. Could someone please give the info.
Thanks.

1 posts - Mon Nov 07, 2016

5 posts - Tue Nov 08, 2016

5 posts are hidden.

  
977 views
Nov 09 2016 (08:16)
Rizwan NZB Jn~   214 blog posts
Re# 2050965-8            Tags   Past Edits
Situated somewhere 10kms apart from each other.

  
Nov 09 2016 (08:22)
Rizwan NZB Jn~   214 blog posts
Re# 2050965-9            Tags   Past Edits
Ankapur is located between NZB and Armoor, so if we go by road the works at first crossing are still going on. It looks like the train will cross NH16 on the road itself, hope they do something like make the road go under the tracks (since the tracks are already laid, they are no chances of constructing ROB there). And there is a big 2 way ROB at the second crossing. The attached picture doesn't show the ROB but it has been already constructed. Google hasn't updated the map.

  
822 views
Nov 13 2016 (09:10)
Shubham NZB Jn~   189 blog posts   3 correct pred (75% accurate)
Re# 2050965-10            Tags   Past Edits
Level crossing at mamidipalli.
Isn't it?

  
768 views
Nov 13 2016 (11:24)
Rizwan NZB Jn~   214 blog posts
Re# 2050965-11            Tags   Past Edits
I don't know the exact village name but its near Ankapur.

  
703 views
Nov 13 2016 (23:20)
Shubham NZB Jn~   189 blog posts   3 correct pred (75% accurate)
Re# 2050965-12            Tags   Past Edits
It is mamidipalli my frnd.....confirmed....

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 2
Trains with ARP 15 Dep on: Tue Mar 7
Trains with ARP 30 Dep on: Wed Mar 22
Trains with ARP 120 Dep on: Tue Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site