Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Feb 24, 2017 10:10:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Feb 24, 2017 10:10:29 IST

Blog Entry# 2053417  
Posted: Nov 09 2016 (06:40)

1 Responses
Last Response: Nov 09 2016 (06:40)
  
Rail News
0 Followers
354 views
Crime/AccidentsCMRL/Chennai Metro  -  
Nov 09 2016 (06:37)   Metro extension: Tender floated for elevated line

rdb*^   126032 news posts
Entry# 2053417   News Entry# 285180         Tags   Past Edits
CHENNAI: Commuters could, in a couple of years, be travelling above the congested roads of north Chennai to the rest of the city as Chennai Metro Rail has floated tenders for construction of elevated corridor for 9km phase-1 extension from Washermenpet to Wimco Nagar. Work to build a 2km tunnel, as part of the project, is already under way. The extension project is planned for completion by 2019.
CMRL has floated tenders for construction of a part of the elevated stretch in north Chennai at Toll Gate and Wimco Nagar. It includes building of columns and pile cap that will hold the elevated viaduct for a stretch of about 3km near Toll Gate and Wimco Nagar. The total elevated line is about
...
more...
7km with six stations.
While the line alignment plan and location of the piers would be provided by CMRL, the contractor is expected to handle identification and shifting of utilities at the location where the foundation would be laid, make detailed traffic diversion plan in consultation with the city traffic police and all associated works for a stretch of about 3km between Toll Gate and Wimco Nagar.
The phase-1 extension project, which was approved by the Central government earlier this year, is being built at an estimated cost of Rs 3,770 crores.
CMRL has also released a report on the preliminary investigations conducted at the project site on soil and sub-soil water condition. The study was necessary for laying of foundation for elevated stretch and also for tunnel boring purposes. While Chennai's soil has mostly clay, shale and sandstone, ground studies have shown sandy areas like Tiruvottiyur and New Washermenpet.
Construction for 2km underground stretch started after chief minister J Jayalalithaa laid the cornerstone in July. Preliminary work of the project started towards the end of 2015, much before it received Centre's nod for fund allocation. Metro officials began land acquisition process for the construction of the line and issued notices to residents who had objections. Officials wanted to clear all the hurdles for construction so that work could begin immediately once the project was cleared by the Centre. Officials said as the viaduct for the elevated corridor would be wider than the busy stretches of north Chennai and its construction may cut into the frontage of houses and shops.

  
561 views
Nov 09 2016 (06:40)
rdb*^   30561 blog posts   359684 correct pred (79% accurate)
Re# 2053417-1            Tags   Past Edits
nice ,,

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 6
Trains with ARP 15 Dep on: Sat Mar 11
Trains with ARP 30 Dep on: Sun Mar 26
Trains with ARP 120 Dep on: Sat Jun 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Yesterday (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site