Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Apr 30, 2017 03:19:37 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Apr 30, 2017 03:19:37 IST

Blog Entry# 2053840  
Posted: Nov 09 2016 (15:59)

8 Responses
Last Response: Nov 12 2016 (19:58)
  
Imaginary
0 Followers
872 views
010
Nov 09 2016 (15:59)   IMG52131/♥♥Raipur-Vishakhapatnam Jan Shatabdi Express♥♥ | TIG/Titlagarh Junction (3 PFs) | R/WDP-4D

Aniket~   288 img trains   281 popular
3072 green flags   12 red flags   11 green per Train
Entry# 2053840            Tags   Past Edits
Please rate this connection between Raipur and Vishakapatnam and Give suggestions

1 posts - Wed Nov 09, 2016

1 posts - Thu Nov 10, 2016

1 posts - Fri Nov 11, 2016

  
469 views
Nov 11 2016 (11:47)
MY FRIEND IS BACK~   12687 blog posts   41 correct pred (48% accurate)
Re# 2053840-4            Tags   Past Edits
think posted this in wrong train. please check in VSKP-R section where Kathua and Samba Came? Kahin Modiji ne naya naam to nahi rakha koi station ko? taki woh feel hojaye ki we have HIMALAYAS here?

  
414 views
Nov 11 2016 (11:49)
legendry Archana Super Express with LHB~   163 blog posts   9 correct pred (64% accurate)
Re# 2053840-5            Tags   Past Edits
Sry I was to write green here--

  
420 views
Nov 11 2016 (12:23)
Aniket~   4689 blog posts   342 correct pred (66% accurate)
Re# 2053840-6            Tags   Past Edits
Thanks!!

  
267 views
Nov 11 2016 (12:24)
Aniket~   4689 blog posts   342 correct pred (66% accurate)
Re# 2053840-7            Tags   Past Edits
What happened???

  
Nov 12 2016 (19:58)
For Better Managed Indian Railways~   1933 blog posts
Re# 2053840-9            Tags   Past Edits
Dear friend the R-VSKP route does not have a high unsatisfied demand. Presently there are many options for from R to VSKP like
(1) 18517/8 Korba-R (dep 20:10)-VSKP(7:00) daily exp. Which is only a 16 coached train and highly convenient to R paxs. There is enough scope for additional coaches. 18573/4 VSKP-R-BGKT weekly (Dep 21:40, VSKP arr 6:30) is also a convenient train. In fact many paxs from Durg-Bhilai too catch this train from R.
(2) For day time journey 12807/8 (Samta Exp 5 days a week), 17481/2 (BSP-R-TPTY biweekly), Durg-VSKP pass, R-VSKP pass,
...
more...
etc are there.
(3) For short distance day time paxs on route many other BBS/PUI bound trains are there from R. like Durg-Jagdalpur triweekly, R-Junagarh dailypass, Ahmedabad-PUI Exp. (5days a week), Durg-Puri daily are other convenient trains available throughout the day.
(4) Under these circumstances, JS from Raipur shall cry for patronage.
(5) Problem with this train is 5:40 departure from R shall be inconvenient, 8hr 35min journey time shall not permit the return journey with the same rake. i.e. 2 rakes shall be required else it will reach R at midnight which no pax shall prefer. Midway stations have very low pax. potential.
(6) If 2 rakes are to be used, then a better option for JS on the route is NGP-G(130)-DURG(265)-Bhilai-R(308)-TIG(510)-VSKP(8 38km) which can be covered in 13-13.5 hrs with a good and pax. friendly time slot. Unsatisfied demand exist in Bhilai—Durg-G-NGP section and respectable patronage is possible for the train.
(7) Further, extension of this train to BZA could have been a very good option, but the distance(1188km) is too long. The train has to clock an avg speed of whopping 70kmph to ensure convenient timing. We can wait till the Doubling of R-TIG & tripling of TIG-VZM along with electrification is over. With new capital of AP near BZA, this extension could have come very handy for the people of the large stretch of AP served by the train, for going to their state capital.
(8) The train can alternatively be westward extended to Amravati (175km) with the same rake. The slot of existing 12119 Amravati (AMI dep 5:30)-NGP (arr 8:15) S/F intercity Exp. may be used with advantage. Onward journey from NGP-Dep 8:30 and final VSKP arrival between 21:30 to 22:00 should be a good option. Amravati is not connected to cities East of NGP and appreciable road traffic is there. The existing rake of the AMI-NGP S/F Exp shall be free, and can be run on some other route or to augment other popular trains.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed May 10
Trains with ARP 15 Dep on: Mon May 15
Trains with ARP 30 Dep on: Tue May 30
Trains with ARP 120 Dep on: Mon Aug 28

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site