Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Feb 22, 2017 21:22:58 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Feb 22, 2017 21:22:58 IST

Blog Entry# 2054084  
Posted: Nov 09 2016 (19:29)

1 Responses
Last Response: Nov 09 2016 (19:29)
  
Rail News
0 Followers
388 views
Other News
Nov 09 2016 (17:04)   Mumbai: Railways paves way for Rs 103 cr Andheri-Goregaon line, literally - News

Jayashree ❖ Amita*^   35471 news posts
Entry# 2054084   News Entry# 285241         Tags   Past Edits
You can expect work on the Rs 103 crore Andheri-Goregaon Harbour line to start soon. Authorities have demolished the illegal bar and another structure near Jogeshwari station because of which the line had remained stuck for over two years. On November 5, officials demolished the structures, removed the rubble, dumped it in trucks and took it away, all under police protection. Two trucks, one JCB machine and police vans were pressed into service for the demolition. Out of the way Officials said the demolished structures — New Rishi Desi Bar and another near it — were next to Jogeshwari station (W) bus depot and adjacent to platform one. There is a level-crossing gate that was shut for vehicular movement and people, but in mid-October it was opened, as there was too much pressure on the foot overbridge (FOB). There had even been a court case going on the illegal edifices with...
more...
the railways saying it needed the land for the proposed extension of the Chhatrapati Shivaji Terminus-Andheri Harbour line till Goregaon, which was supposed to be completed in May 2014. Now, Mumbai Rail Vikas Corporation officials have kept a deadline of March 2017. Presently, Jogeshwari station comes both sides when travelling in Churchgate-bound trains, ie people can alight from both sides of a compartment, either on platform 1 or 2. Sources said the island platform connecting 1 and 2 would be removed and platform 1 would be extended by six metres towards Churchgate-end with a landing connecting it to the existing FOB. This will allow the Harbour line to go from behind platform 1 on the west to the new concourse constructed for Harbour line trains at Jogeshwari, which is towards Borivli. Once this line is ready, trains from Panvel or CST will go all the way up to Goregaon. In the next phase, the line will be extended till Borivli.

  
Nov 09 2016 (19:29)
For Better Managed Indian Railways~   1933 blog posts
Re# 2054084-1            Tags   Past Edits
Great news This step should motivate the other officials who are struggling with illegally occupied IR land.
IR have to start the construction of the line immediately and complete it soon lest the encroacher come back and every thing shall be back to square one.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Mar 4
Trains with ARP 15 Dep on: Thu Mar 9
Trains with ARP 30 Dep on: Fri Mar 24
Trains with ARP 120 Dep on: Thu Jun 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site