Blog Entry# 2055322  
Posted: Nov 10 2016 (20:34)

6 Responses
Last Response: Nov 12 2016 (20:53)
  
★★  General Travel
0 Followers
2052 views
Nov 10 2016 (20:34)   GTL/Guntakal Junction (6 PFs)

Vishnu Datta Jacke   105 blog posts
Entry# 2055322            Tags   Past Edits
India's Most Powerful Locomotive hauls passenger : Indian Railway's
57437/8 GTL~HUP~GTL Pass with AJNI WAG9 :)

1 posts - Thu Nov 10, 2016

  
1532 views
Nov 11 2016 (02:46)
Tabbys star and the Alien outpost~   2548 blog posts
Re# 2055322-2            Tags   Past Edits
Must have just got whichever freight loco was available at GTL. The line capacity may be low now because of the incomplete sub-station works. So only a few trains can run with e-locos, and it will be safer to just let the passengers get it now. Also, the route now heavily depends on GTL and SBC/YPR for e-locos, and both places only have trip sheds and depend on incoming trains for locomotives. Since both places have a well-established LSA's now, it will take some time before both zones can work out the Loco sharing arrangements, and providing additional locomotives to both places and start running trains with regular links.
Mostly the prestigious trains won't get electric
...
more...
locos until further electrification is completed. Raj/Duronto will only get electric traction after GTL-Wadi is electrified, KSK and other trains going via GY will not be electrified until the Dhone-SC route is electrified. First express trains to get e-locos could be the ones reversing in GTL like Prashanti or Prashanti Nilayam.
KK may switch to electric traction between GTL-SBC ( may be not likely), but I hope KK at least sticks to Twin ALCO links until GTL-DD is electrified. Twin ALCO links were one of the most iconic things about the KK, and no plain, washed out WAP7 can match that!

  
1171 views
Nov 12 2016 (01:18)
Foamer~   1839 blog posts
Re# 2055322-4            Tags   Past Edits
If SWR is really serious about cutting down diesel bill and maintaining punctuality, they will surely work out LSA. Many trains can easily have LSA at GTL.
-
As for GY or Dhone - both have crew changing facilities. If they can work out LSA for a few trains it will be good, as the loco may not need maintenance, since its just some 350 odd Kms from SBC, so that works out to 700 Kms between maintenance. They don't need ETS for such short hauls isn't it?.

  
Nov 12 2016 (01:45)
Tabbys star and the Alien outpost~   2548 blog posts
Re# 2055322-5            Tags   Past Edits
It'll take some time though. In case of routes like MMR-Pune or NDLS-GKP, the e-locos were being provided from NDLS side, and trains just had to proceed further from MMR or GKP with the same e-loco. So they could immediately start switching to e-locos.
But in this case, most of the trains in this route originate at SBC/YPR which have only trip sheds and cannot easily provide more locomotives on demand. There are about 30 odd trains on this route every week, and it'll take time for SCR/SWR to make arrangements to have more locomotives ready at GTL or SBC/YPR. So rest assured, it would take a couple of months on completion of the substation to
...
more...
have trains running with e-locos here.
The bigger problem is the incomplete sub-station. Unlike diesel routes which have practically no capacity constraints, Electrified routes are limited by the sub-station capacity. As the Someshwara substation is still to be completed, not many trains can run with electric traction as of now.
GY has only 2 platforms, that's why SCR doesn't do any loco changes there. Trains like Venkatadri and KCG-MS run with diesel traction between RU-GY . Dhone can surely have loco changes, so trains with scheduled halts will get a loco change there, but trains with only technical halts there like Raj/KSK will continue with diesel locos to save time.
SCR has traditionally preferred running trains with diesel-under-wire until the routes are completely electrified till convenient locations, particularly the twin-diesel hauled trains. So, the trains by-passing GTL and not having a scheduled halt at Dhone might not get e-locos until completion of the route till SC.

  
Nov 12 2016 (16:58)
Vishnu Datta Jacke   105 blog posts
Re# 2055322-6            Tags   Past Edits
Have to wait becoz in YNK~DMM only 17kv Volts giving instead of 25Kv ,
i heard that some problem at Someshwaram Sub-Station.
when it recovers we can see many with with AC Loco's 18463/4 , 17603/4 , 11013/4 , YPR~ADI , CBE~Rajkot, Okha~Tuticorin this all trains going to get e~link only bwt GTL~SBC ;
SBC~NZM Rajdhnai ,
YPR~DEE
...
more...
Duronto ,
YPR~SC Garibrath ,
tht above trains will get End~End E-link
already Links also setted up RPM Shed no worries .

  
1011 views
Nov 12 2016 (20:53)
Foamer~   1839 blog posts
Re# 2055322-7            Tags   Past Edits
Thanks. Any idea when the problem will be resolved and it will achieve 25KV?
-
The problem with current govt is they are inaugurating things half-done. Now first off they are good, in the sense they are trying to complete old projects before announcing new. But why inaugurate before things are completed?
-
I
...
more...
keep going back to Palani-Palakkad line. They did the GC. Good ..... Very Good!!!! But to get full benefit of the credit from people, politically, run atleast one or two passengers thru and thru. Or else, instead of appreciation and votes, people will be angry and the backlash will damage their chances, come 2019.
-
Why inaugurate NDL-YA line before things are in place? People waited for 20 years, they will surely wait another year. Instead now, only the memory of badly finished project and non-utilization of the line will be on top of people's mind.
-------------
Some trains like Nagercoil/TVC-CST, TN-OKHA, CBE-RJT trains will get e-locos before SBC trains because they pass thru ED, so they may get from ED to GTL. This I base on the document shared by PUNE/DD members who before the inauguration shared a doc in which RB had asked zones to run some of these trains with e-locos on electrified section. Also, I recently saw a train (17316) which hitherto was coming with d-loco, came to YPR with e-loco from ED.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jun 7
Trains with ARP 15 Dep on: Mon Jun 12
Trains with ARP 30 Dep on: Tue Jun 27
Trains with ARP 120 Dep on: Mon Sep 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site