Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Feb 23, 2017 17:23:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Feb 23, 2017 17:23:39 IST

Blog Entry# 2057349  
Posted: Nov 12 2016 (14:40)

1 Responses
Last Response: Nov 12 2016 (14:40)
  
Rail News
0 Followers
435 views
Other News
Nov 12 2016 (14:23)   Dedicated Freight Corridor To Be Complete By 2019: Indian Railways

Jayashree ❖ Amita*^   35471 news posts
Entry# 2057349   News Entry# 285496         Tags   Past Edits
NEW DELHI:  The Indian Railways today said that the work on the dedicated freight corridor will be completed by the end of 2019, which will result in enhanced profits and punctuality.
"The work on the dedicated freight corridor is on fast track and it is expected to be complete by December 2019," Railway Board Chairman A.K. Mital said while speaking at the Economic Editors' Conference 2016.
"Once the dedicated freight corridor work is complete, it shall prove to be a 'game changer' for the railways."
He
...
more...
told the conference that Ministry of Railways has finalised contracts worth Rs. 35,000 crore for the dedicated freight corridor.
On punctuality enhancement, Mr Mital predicted that By 2020, the punctuality rate will reach 95 per cent. Currently, only 80 per cent of trains in India run on time.
Emphasising the need to increase the speed of the trains, he said: "After launching the Gatimaan Express earlier this year, we are also working to enhance the speed of all Express trains on the Diamond Quadrilateral High Speed Rail Network."
"Feasibility studies of Delhi-Mumbai, Delhi-Kolkata and Mumbai-Chennai are underway."
Currently, the average speed of freight trains in India is about 25 km per hour, while that of average Express train is in the range of 50-55 km per hour.
"After the completion of the work on these tracks the average speed of the Express trains would go up to 75 kmph, with maximum speed of 100 kmph, while the average speed of the goods train would improve to 50 kmph," the Railway Board Chairman said.
Mr Mital elaborated that the railways, which spends about Rs. 30,000 crore per year on its energy requirements, will try and bring this cost down by 10 per cent.
"Every year, we spend Rs. 30,000 crore on energy expenses, and now we are trying to make savings on the energy bill, we are targetting to reduce the energy bill by 10 per cent currently (not on diesel part but on electricity part)," Mr Mital said.
"We have asked all the states to give us NOCs to procure cheaper power from wherever it is available in the states."
The Indian Railways spends about Rs. 18,000 crore on diesel, and Rs. 12,000 crore on electricity bill.
Emphasising the projects undertaken by the railways in the northeastern states, Mr Mital said: "By the end of this fiscal year (2016-17), all the metre guage tracks will be converted to broad guage in the northeastern states."
"By 2020, we would connect all the northeastern states' capital cities with railways."
He said that railway tracks will become human waste free from 2019 and that unmanned railway crossings will be eliminated in the next four to five years.
Mr Mital pointed out that lack of investment in infrastructure erection had stalled railway's modernisation.
"In the last few decades, we didn't invest much in the railways, due to which the modernisation of infrastructure and upgradation of the railway tracks didn't take place," he said.
"But now there has been a paradigm shift," Mr Mittal said, and added that extra budgetary resources such as loans and bonds have been utilised for infrastructure creation.
On an annual basis, the Indian Railways ferry about 800 crore passengers and three lakh metric tonnes of freight.

  
1117 views
Nov 12 2016 (14:40)
Mazi IRI   645 blog posts
Re# 2057349-1            Tags   Past Edits
"By 2020, we would connect all the northeastern states' capital cities with railways."
IMPOSSIBLE.
Presently Guwahati, Agartala, Itanagar (Naharlagun) connected.
Aizwal (Sairang) & Imphal ll connect by 2019/2020.
Less possibility of Kohima(Zuzba) by 2020.
...
more...
may be 2023.
Shillong & Gangtok impossible. It ll on 2025.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Mar 5
Trains with ARP 15 Dep on: Fri Mar 10
Trains with ARP 30 Dep on: Sat Mar 25
Trains with ARP 120 Dep on: Fri Jun 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site