Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Feb 25, 2017 08:19:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Feb 25, 2017 08:19:29 IST

Blog Entry# 2059256  
Posted: Nov 14 2016 (10:14)

10 Responses
Last Response: Nov 17 2016 (22:02)
  
Rail News
0 Followers
1970 views
Commentary/Human InterestKR/Konkan  -  
Nov 14 2016 (10:14)   Konkan Railway invites Composite Open Tenders for Railway Electrification of its entire Route

rdb*^   126086 news posts
Entry# 2059256   News Entry# 285613         Tags   Past Edits
Konkan Railway invites Composite Open Tenders ( Electrical traction, S&T and civil works combined) for Railway Electrification of its entire Route ( 970 TKM).Work is divided in two section.
Section -1 is from Roha (excl.) to Verna(excl.) -582 TKM, estimated cost Rs.362.86 Cr. Click here for NIT of Section-1.
Section -2 is from Verna (incl.) to Thokur (incl.) -388 TKM, estimated cost Rs.249.65Cr. Click here for NIT of Section-2.
Pre-bid
...
more...
conference scheduled on 18th November 2016, Tenders due to open on 15th December 2016.
Last Updated - Nov 2016
Home| Screen Reader Ac
click here

5 posts - Mon Nov 14, 2016

  
782 views
Nov 14 2016 (19:11)
rdb*^   30576 blog posts   359804 correct pred (80% accurate)
Re# 2059256-6            Tags   Past Edits
Tender Details and Cost etc.
click here
click here

  
874 views
Nov 14 2016 (20:07)
Foamer~   1265 blog posts
Re# 2059256-7            Tags   Past Edits
Good News!
-
Similarly they could have started with the electrification of the existing line of CR: GR-DD. That will work out to a lesser cost than waiting for the stretch to be doubled first and then electrified.

  
922 views
Nov 14 2016 (21:29)
Guest: 2522f82d   show all posts
Re# 2059256-8            Tags   Past Edits
Doubling will take more than a decade,electrification will complete fast

  
935 views
Nov 14 2016 (22:23)
12051 Janshatabdi Express~   1794 blog posts   195 correct pred (70% accurate)
Re# 2059256-9            Tags   Past Edits
For doubling jada land acquisition ki jarurat nai..kuch kuch jagahi hi pad Santa he...
Already 30-40 mtr land acquired by konkan railway...in 90s

  
720 views
Nov 17 2016 (22:02)
rdb*^   30576 blog posts   359804 correct pred (80% accurate)
Re# 2059256-10            Tags   Past Edits
Railway Electrification of KRCL( Verna -Thokur section)-Corrigendum - NIT No.KR/CO/EL/RE/Roha-Verna/01 dated 28.10.2016 Click Here
click here
Pre-bid conference re-scheduled on 21st November 2016, Tenders due to open on 15th December 2016.
Pre-Bid conference postponed to 21st Nov 16

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Mar 7
Trains with ARP 15 Dep on: Sun Mar 12
Trains with ARP 30 Dep on: Mon Mar 27
Trains with ARP 120 Dep on: Sun Jun 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site