Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 13:38:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 13:38:51 IST

Blog Entry# 2063792  
Posted: Nov 18 2016 (09:52)

5 Responses
Last Response: Jan 22 2017 (11:06)
  
★★★  General Travel
0 Followers
2679 views
Nov 18 2016 (09:52)   12560/Shiv Ganga Express | NDLS/New Delhi (16 PFs)

©®™१२४३९ राँची राजधानी एक्सप्रेस १२४४० ™®©^~   2069 blog posts   19395 correct pred (75% accurate)
Entry# 2063792            Tags   Past Edits
PM's constituency train, and SG bro's favourite train ( Admin of IRI Mr. SG Prasad from MAS) at NDLS. Notice the LS3 coaches having MPS of 105 kmph and 130 kmph variable tracks specifications and speed

  
SG Bhai 😋

  
Haa unki fav hai. screen name bhi unka to wahi hai

  
2068 views
Nov 18 2016 (17:12)
18626 Super £xpresssss~   1679 blog posts
Re# 2063792-3            Tags   Past Edits
First elaborate,whts the meaning, 130 and 105 both are printed,so were the coaches capable of 130 earlier and then degraded to 105, or whts these stands for!,, And if railway have restricted Coaches to 105 then 110 can be done? With these coaches ,is it safe?! Or this train can fulfill its average requirement even running below 105?! ,.

  
Nov 18 2016 (17:24)
A good day ahead~   2313 blog posts
Re# 2063792-4            Tags   Past Edits
These are speed limits for different track construction/maintenance standards. In the pic, you can see beside the '130' number, that the track maintenance standard is mentioned as 'C & M I Vol I'. 'C & M I Vol I' standards are basically civil and mechanical engineering standards that are to be followed during track laying and maintenance, if the route has to support high speeds trains. This is informally called the 'Rajdhani standard' of tracks.
These markings mean that, on tracks constructed and maintained to Rajdhani standards ( or C & M I Vol I standards to be technical), the coach can be run at an MPS of 130 kmph. On other tracks, which are constructed with
...
more...
lesser standards ( like branch lines and non-important routes), the coach can me run at an MPS of 105 kmph only.

  
787 views
Jan 22 2017 (11:06)
©The Dark Lord™~   4873 blog posts
Re# 2063792-5            Tags   Past Edits
RDSO ki report ka number hai C&M Vol. 1 Jisme certain benchmarks mention hai track maintenance ke. Agar kisi route ki track us benchmark ko follow karti hai to waha ye coaches 130 km/hr pe chalegi or jaha nahi hai waha coach ka operational speed 105 hoga.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site