Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Feb 19, 2017 17:55:52 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Feb 19, 2017 17:55:52 IST

Blog Entry# 2066263  
Posted: Nov 20 2016 (19:18)

6 Responses
Last Response: Nov 21 2016 (16:47)
  
★  General Travel
0 Followers
2937 views
Nov 20 2016 (19:18)   15016/Yesvantpur - Gorakhpur Express | HNMN/Hanuman Circle (1 PFs)

Vishnu Datta Jacke~   113 blog posts
Entry# 2066263            Tags   Past Edits
15016 Yesvantpur~Gorakhpur Express led by an Offlink GY WDG3A twins in rampage

1 posts - Sun Nov 20, 2016

  
2485 views
Nov 20 2016 (19:34)
Jagdeesh Srivastava~   3721 blog posts   8912 correct pred (72% accurate)
Re# 2066263-2            Tags   Past Edits
but its very very slow train.
just wasted a LHB rake.

  
2391 views
Nov 20 2016 (20:04)
GKP LKO Section 120kmph Sucessful Trail Done~   2343 blog posts   4 correct pred (100% accurate)
Re# 2066263-3            Tags   Past Edits
huge slack is given that's why

  
2303 views
Nov 21 2016 (16:31)
suraj prakash   6489 blog posts   6504 correct pred (74% accurate)
Re# 2066263-4            Tags   Past Edits
Don't say wastage. Two days back we saw how much could have been saved if INDB-RJPB express would have been LHB rakes.
Its high time to totally shell out the ICF rakes away and give LHB to ALL trains irrespective of zone,SPEED,route etc.

  
2247 views
Nov 21 2016 (16:34)
LHB Bikaner Kochuveli^~   78566 blog posts   5088 correct pred (78% accurate)
Re# 2066263-5            Tags   Past Edits
lekin Prabhu to ye baat samjhna hi nahi chahte...wo to bas bullet - bullet gaate rehte hain...

  
2276 views
Nov 21 2016 (16:47)
thewanderer*^   2135 blog posts   908 correct pred (79% accurate)
Re# 2066263-6            Tags   Past Edits
but prabhu has increased production of LHB coaches unlike his predecessors. The bullet train project doesnt affect LHB production in anyway and its not a priority for railways , at least right now. By the time bullet train project starts, if at all, all trains will be LHB. Infact its under prabhu that many normal expresses are getting LHB which was limited to premium trains earlier.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Mar 1
Trains with ARP 15 Dep on: Mon Mar 6
Trains with ARP 30 Dep on: Tue Mar 21
Trains with ARP 120 Dep on: Mon Jun 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site