Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Feb 21, 2017 09:06:15 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Feb 21, 2017 09:06:15 IST

Blog Entry# 2066469  
Posted: Nov 21 2016 (00:14)

2 Responses
Last Response: Nov 21 2016 (00:18)
  
Rail News
0 Followers
413 views
Major Accidents/DisruptionsNCR/North Central  -  
Nov 20 2016 (20:13)   Indore-Patna Express derailment: Passengers’ complaint of thunderous sound went unheeded

HWH WAP7 getting used to with DHN~   3 news posts
Entry# 2066469   News Entry# 286193         Tags   Past Edits
The Indore-Patna Express derailed early on Sunday because the wheels of a coach had jammed, officials indicated, as passengers complained they alerted authorities of an unusually loud sound but were asked to not worry.
Eyewitnesses of the accident – which killed more than 100 people – told HT that they told the ticket collector about a thunder-like sound from underneath their S1 coach in Jhansi, hours before the accident.
“The sound was unusual. I travel a lot and I could make out the sound wasn’t right. Some passengers of my coach shared their
...
more...
concern with the TTE at Jhansi. He told us it was normal,” said Deepak Rajbhar, 32, a resident of UP’s Azamgarh who was in S1 coach with his uncle Jai Prakash. He is currently admitted at a hospital in Kanpur.
He said other passengers told the guard that the sound was very loud and people in the coach could not hear each other properly.
Neeta Gujarati, another survivor from the S1 coach who underwent a CT scan at Lala Lajpat Rai hospital in Kanpur for head injury, said she was sleeping. “There was a jerk and I fell,” she said.
Railway officials, who did not wish to be named, said the problem appeared to be in the S1 and S2 coaches – the worst-hit by the accident – and it concerned the wheels.
“The wheel apparently became immovable. As a result the coaches derailed one by one,” they said.
“The way the coaches have derailed on the side and climbed onto each other points to this theory. The railways have begun a preliminary inquiry into the accident and the picture will be clear after that,” they added.

  
1202 views
Nov 21 2016 (00:14)
For Better Managed Indian Railways~   1933 blog posts
Re# 2066469-1            Tags   Past Edits
So some indications of complacency at some point of time have started trickling in. Ideally the coach with jammed wheel should have been rectified or detached,or train may have proceeded at a safe low speed till a major station where the rectification of problem was possible. Available technology need to be fully harnessed and work practices/methodology need to be changed accordingly to avoid such incidences. Sensors can be installed which give indication of jammed wheels and other technical defects to loco pilot/guard. But all these call for a substantial investment which is not possible with the very low fare (non ac class) regime and inefficient IR ways of working, unless Govt pays for the subsidies which are currently borne by IR.
At
...
more...
least a couple of persons with technical background/ training must travel in the trains, the TTE being a non technical person cannot appreciate these kind of problems.
It is better if persons do multi tasking i.e. do the technical job when required and do non technical job like ticket checking etc during normal time. Other wise employing separate technical and commercial staff in every train shall be too costly for IR. Today there is no dearth of technical institutes/ ITIs/ Polytechnics etc. The present TTE staff may be given a preliminary training about the abnormalities during train operation so that corrective steps can be taken before happening of an accident can. One person should be in-charge of train who should be head of all the IR employees aboard the train and supposedly answerable for all issues of running train like -pax safety/convenience/cleaning/water/meals etc,and technical issues as well.

  
1190 views
Nov 21 2016 (00:18)
HWH WAP7 getting used to with DHN~   3551 blog posts   251 correct pred (59% accurate)
Re# 2066469-2            Tags   Past Edits
Yup there should be an attendant in each reserved coach...
And WR should give new coaches to INDB and they should replace the old one...

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Mar 3
Trains with ARP 15 Dep on: Wed Mar 8
Trains with ARP 30 Dep on: Thu Mar 23
Trains with ARP 120 Dep on: Wed Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2165159
    Feb 15 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
  • Entry# 2133126
    Jan 20 2017 (01:29AM)


    The modification to the TL Update scheme - i.e. the introduction of the new RAC System - has led to some efficiency with TL Updates. More TLs are being discussed, and quickly moved up. However, we still have on Average, about 300 Waitlisted TLs in the backlog at any time, and our hard-working and diligent TLMs...
Scroll to Top
Scroll to Bottom


Go to Mobile site