Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Apr 27, 2017 16:41:48 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Apr 27, 2017 16:41:48 IST

Blog Entry# 2068220  
Posted: Nov 22 2016 (20:39)

1 Responses
Last Response: Nov 22 2016 (20:39)
  
Rail News
0 Followers
587 views
Nov 22 2016 (07:29)   Rlys to speed up coach replacement

Rail Fanning~   141 news posts
Entry# 2068220   News Entry# 286350         Tags   Past Edits
Shaken railway authorities on Monday decided to speed up the replacement of old coaches with safer German-designed ones.
LHB coaches, developed by Linke Hofmann Busch and manufactured in India at a railway factory in Kapurthala, do not topple over or telescope into one another in the event of an accident, and will help minimise loss of life.
The Railway Board convened an urgent meeting, presided over by chairman A K Mittal, to take stock of safety issues. It reviewed the recently introduced measures and devices. This comes in the wake of the
...
more...
Indore-Patna Express derailment in Kanpur on Sunday, in which 145 people lost their lives. According to a senior official, the board discussed replacement of old-style (ICF) coaches with the modern and more secure LHBs on an urgent basis.
The first step would be to stop production of old-style coaches in all the manufacturing units of the Railways, and this would be done by 2019 or earlier. The Railways has three coach factories – Integral Coach Factory (ICF), Chennai; Rail Coach Factory, Kapurthala, and Modern Coach Factory, Rae Bareily.
At present, the Railways produce around 4,000 coaches per year. The Kapurthala factory manufactures only LHB coaches.
The other two units produce both old-styled coaches and LHBs. In total, 1,500 LHB coaches are produced every year. The Railways have 63,000 coaches, of which 53,000 belong to the old category.
“In fact, more than half of the LHB coaches are being used in MEMU (Mainline Electric Multiple Unit) and DMU (Diesel Multiple Unit) trains,” a top rail official told DH.
Officials admit that complete replacement is a distant dream because every coach has a life of at least 25 years. And, each costs Rs 1 crore, they said.
“To minimise damage, modern security features are being added to old coaches,” a rail official said. Only 15 days ago, the Railways had introduced an Ultrasonic Broken Railway Detection Device on a pilot basis in two zones, the North Central Railways and the Northern Railways. The Kanpur accident site falls under the NCR zone. “The device detects fractures through the passage of ultrasound rays. We have decided to fit it in both zones,” said the official.

  
944 views
Nov 22 2016 (20:39)
gopalfirst   78 blog posts
Re# 2068220-1            Tags   Past Edits
why can you give LHB coach order to BEML?

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun May 7
Trains with ARP 15 Dep on: Fri May 12
Trains with ARP 30 Dep on: Sat May 27
Trains with ARP 120 Dep on: Fri Aug 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site